BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Offutt AFB, Nebraska. Completed plans call for the renovation of a military facility.

Provide durable, resilient, and non-porous flooring finish commensurate with the requirement of repair, operation, and maintenance of mobile devices and sensitive network infrastructure. This is a full-service project to include removal, disposal, and installation. All incidentals, i.e. (glue, transitions, flooring, and surface preparation shall be considered within the ). See attached statment of objectives for details. Deadline 08/25/2023 Room 635 a. This is a full-service project to include removal, disposal, and installation. All incidentals, i.e. (glue, transitions, flooring, and surface preparation shall be considered within the ). i. The Contractor shall follow the Air Force Furnishings Commodity Council (AF FCC), Ordering Guide, August 2020, or most current version, and utilize the Tier I manufacturers and pricing. ii. The Contractor shall thoroughly clean and prepare existing substrates to receive new floor covering(s). Contractor shall fill holes and any cracks that measure wider than 1/8 inch. Holes larger than 1/4 inch in diameter shall be filled with crack filler as appropriate for this application. iii. The Contractor shall install a durable, resilient, and non-porous flooring finish and trim molding/border according to drawings/floor plans in accordance with manufacture installation instructions; CRI-104; and ETL 07-4. iv. Provide the user with 2% additional flooring materials at completion of project. b. Customer service area (Room 635) and 2 offices (approximately 750 SF) i. Install a durable, resilient, and non-porous flooring material; cannot be carpet due to high traffic facility and the nature of duties within the service area. See attached floor plan. c. Remove and replace vinyl base within project area (approx. 100LF). i. The contractor shall coordinate with users for approval of vinyl base color and size. d. Commercial walk off area (~45 SF) i. The walk off area upon entering the facility shall be of an allweather variety to withstand the elements throughout the year. ii. Install resilient transition strips (~15 LF) 2" wide, appropriate for the border adjacent to the main floor. See attached floor plan. Technical questions are due not later than 04:00 PM CDT on 29 August 2023. 5. For questions please contact the contract administrator SSgt Ryan Arnold at 402-232-0282 or via email at ryan.arnold.4@us.af.mil.

Post-Bid

Military

$200,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
44
Bidding Soon
482
All Active Projects
236
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2023

October 4, 2023

img_map_placeholder

To Be Determined, Offutt AFB, NE

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.