BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a transportation facility in Stillwater, Oklahoma. Conceptual plans call for site work for a transportation facility; and for the construction of a 31,370-square-foot transportation facility.

**As of September 21, 2023, no bids received. They are not hard bidding this project. ask to remove this project from our list..** Question Cuttoff Date & Time 8/14/2023 06:00:00 PM (ET) Notice is hereby given that City of Stillwater/Stillwater Regional Airport invites Letters of interest (LOI) for the following:Construction Manager at Risk Services for a new Airport Terminal Building. The City of Stillwater/ Stillwater Regional Airport invites Letters of Interest to provide Construction Manager at Risk Services (CMAR) for: The constructing, furnishing, and equipping of a new airport commercial passenger terminal building, approximately 31,370 square feet in size on property at the Stillwater Regional Airport. The new terminal is a one-story building located north of the existing terminal. Any questions regarding this Notice or the proposal documents should be directed to John McClenny 405.742.8233 or john.mcclenny@stillwater.org. The solicitation and screening procedures for the CMAR will follow the City of Stillwater purchasing procedures and will be administered in accordance with the State of Oklahoma Public Construction Management Act for Political Subdivisions (61 O.S. 215 et seq.). Federal Aviation Administration (FAA) instruction guidelines include Table U-9 from the FAA AIP Handbook (Order 5100.38D, Change 1), which describes procurement by competitive proposals for Construction Manager At Risk (CMAR). Additionally, 2 CFR 200.320(d) Procurement by Competitive Proposals. In addition, FAA Advisory Circular 150/5100-14E Change 1, Appendix G will be adhered to during the procurement process. The scope of professional services for the Pre-Construction portion of the CMAR is as follows: a)Conduct architectural and engineering design documents review. b)Conduct constructability reviews c)Provide cost estimating and scheduling during A/E documentation phase d)Competitively procures the construction component of the project in accordance with all FAA competitive bid guidelines The construction portion of the agreement with the CMAR will define the responsibility to ensure the project is completed within budget, on schedule, and in compliance with the construction documents. The terminal construction project utilizing the delivery method of CMAR will implement a competitive bid of all subcontracts in accordance with the guidelines of the Oklahoma Management and Enterprise Services (OMES). In addition this process will meet all applicable FAA guidelines. The project budget including construction, parking, and parking access road is $20 million. It is anticipated that the construction of the new commercial passenger terminal building will begin in the summer of 2024. The construction will be complete and the new commercial passenger terminal will be fully ready to occupy in the summer of 2026. There will be one agreement, with the activation of phases divided into two segments. The first segment of the scope of professional services is to provide pre-construction services support to the A/E design team as they complete their documentation. The funding for pre-construction services is currently available through the City of Stillwater, and is contingent upon receipt of FAA grants. The construction portion of the agreement will not be executed prior to receiving the required FAA Grants. Insurance: The selected Construction Manager at Risk shall have and maintain insurance as specified in the City of Stillwater Special Requirements. Mandatory Federal Contract Provisions: In that the new Stillwater Regional Airport terminal is largely funded by the Federal Aviation Administration (FAA), the Mandatory Federal Contract Provisions are a requirement. Questions about the Letter of Interest should be directed to: Connie S. McFarland, FAIA, LEED AP BD+C McFarland Architects, P.C. Connie@mcapc.com (918) 749.8100 Oral discussions are encouraged for clarification purposes; however responding Construction Managers shall not rely on responses to questions. No oral statements by any person shall modify or otherwise affect the provisions of this Request for a Letter of Interest and/or any contract resulting therefrom. All modifications, addenda and amendments must be made in writing by the City of Stillwater. The final date for questions will be August 14th, 2023, and no later than 5:00 p.m. CST. Please include the following information with your Letter of Interest: 1.DCAM/CAP Form 305CM as provided by the Oklahoma Office of Management and Enterprise Services (OMES). These forms may NOT be altered. 2.Name and email address of primary contact person. (CLEARLY VISIBLE AND EASILY FOUND) 3.Brief description of your firm (history, services, locations, numbers of employees, awards, etc.) 4.Names, proposed role and qualifications of expected project team members. 5.Names of preferred sub-consultants, if any. 6.A statement outlining your experiences with projects of this scope and type; give specific examples, including the names of the projects, the dates completed and client references. Please note if a project team member personally worked on any of these projects. 7.The ability of your firm to commence work upon selection. 8.A brief statement of your firms approach to this project (maximum 10 pages) While the presentation format of the above information is left to the firms discretion, items 1-7 should be easily located, and presented consecutively in the order listed. Some of the above information will be duplicated on the OMES CAP forms. Background Information: Firms may, at their option, submit additional data, photographs, renderings, minority status, etc. for consideration as a supplement to their Letter of Interest. Submittal: The submittal should not exceed sixty (60) pages (all requirements, including OMES forms). No faxed or emailed information will be accepted. Selection: The selection will be made in accordance with Title 61 O.S. 215 et seq., the Public Construction Management Act for Political Subdivisions and Table U-9 from the FAA AIP handbook describing procurement by Competitive Proposals for Construction Managers At Risk (CMAR) 2 CFR 200.320(d) Procurement by Competitive Proposals, and the FAA Advisory Circular AC NO. 150/5100-14E, change1 Appendix G. Initial Screening will be based on the following criteria: Experience on similar projects 35% Professional or specialized personnel 35% Project Implementation 15% Established Office within 300 miles from Airport 15% The top three to six firms from the Initial Screening will be invited to interview. It is expected that the results of the Initial Screening will be known in September. We will contact the invited firms via email to the designated contact person. Final screening/Interviews will probably occur in September with assessment based on the following criteria: Quality of presentation 10% Applicability of Examples and References 35% Implementation - approach and philosophy 35% Adherence to time and budget constraints 20% Additional Information: CMAR point of contact is Connie McFarland, FAIA, McFarland Architects: (918) 749.8100; connie@mcapc.com.

Project Abandoned

Transportation Terminals

$20,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
41
Bidding Soon
641
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2023

September 22, 2023

img_map_placeholder

2020 W Airport Rd, Stillwater, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.