BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Wayne, Indiana. Completed plans call for site work for a water / sewer project.

The Contractor shall furnish all labor, insurance, equipment, materials and power for the complete performance of the following project, Oak Creek and Dupont Estates - Master Meter Installations as follows: Installation of new master meters for two mobile home parks. all in accordance with the Bidding Documents as prepared by the City Utilities Engineering Department, City of Fort Wayne, Indiana. No Bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City of Fort Wayne, Indiana, upon any debt or contract, or, who has failed to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a defaulter as to surety or otherwise, upon any obligation to the City, or is engaged in litigation with the City. The funding source for this project is WATER UTILITY REVENUE.No Bid may be withdrawn for at least 60 days after the scheduled time for receipt of Bids so as to allow review of Bids before announcing award of Contract. The successful Bidder will be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. The City of Fort Wayne's goal for utilization of qualified Emerging Business Enterprises (EBE) as subcontractors on City projects is 10% of the Contract Price. It has been determined that the EBE goal for THIS PROJECT is 10% of the Contract Price Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Design Manager in writing Base bid for this project requires the Contractor to: . Remove existing meters for meter pits #1 & #2 as defined in Appendix A. . Install new 6 inch meters with the following requirements: . Piping, fittings, and any necessary restraint will be Contractor furnished and Contractor installed. . 6 inch ultrasonic meters - two total meters will be Owner furnished and Contractor installed. . Contractor shall provide all meter vault piping, fittings, and restraint associated with each meter installation. Concrete shall be reinforced class A concrete. . Shutdown shall be performed during the nighttime beginning at 10 pm and shall not last for more than 6 hours to have the meter installed and returned to service. Contractor to provide lighting and other items necessary for nighttime work. Native soils may be returned to excavation as deemed appropriate by the contractor. Contractor shall be responsible for settling around valve boxes and structures. Contractor shall provide any needed regrading and reseeding due to settlement for up to 1 year after the installation of the meters

Award

Water / Sewer

$23,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
19
Bidding Soon
555
All Active Projects
217
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

October 4, 2023

img_map_placeholder

Multiple Locations, Fort Wayne, IN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.