BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Farmer City, Illinois. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of October 2, 2023, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. This work shall consist of HMA Surface Removal - Butt Joint, placement of HMA surface course and other collateral work as necessary to complete the project on Crabtree Ct in the City of Farmer City in DeWitt County, IL. The City is now accepting bids for the 2023 MFT Resurfacing/maintenance program. The packet can be found here: website. This program must be a separate bid from the 2023 Resurfacing program, but the work itself may be combined. The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction," Adopted January 1, 2022, the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways," and the "Manual of Test Procedures of Materials" in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein which apply to and govern the construction of City of Farmer City, 23-00000-00-GM in DeWitt County and in case of conflict with any part or parts of said Specifications, the said Special Provisions shall take precedence and shall govern. Traffic control shall be in accordance with the applicable sections of the "Standard Specifications for Road and Bridge Construction," the applicable guidelines contained in the "Illinois Manual on Uniform Traffic Control Devices for Streets and Highways," these Special Provisions, and any special details and Highway Standards contained herein and in the plans. The Contractor shall comply with all applicable provisions of the Prevailing Wage Act. All questions of applicability of the Prevailing Wage Act are governed by the determinations of the Illinois Department of Labor (IDOL). Prevailing wage rates may be obtained from IDOL's website. Maintenance Mill and Overlay and other collateral work as necessary to complete the project in the City of Farmer City in DeWitt County, IL.

Final Planning

Roads / Highways

$460,000.00

Public - City

Paving, Site Work

3

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
27
Bidding Soon
412
All Active Projects
183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

April 1, 2024

img_map_placeholder

Crabtree Ct, Farmer City, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.