Published March 13, 2024 at 8:00 PM

Updated March 14, 2024

Renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a laboratory facility.

Description: Path of Travel / Science Lab Upgrade A Bid Bond along with its Power Attorney prepared on the form attached to the Construction Contract as Appendix C or a Certified Check of the Bidder for five (5%) percent of the Bid Amount must accompany the Lump Sum Bid Form. Immediately upon receipt of Notice of Intent to Award Letter/Signature Page to the Construction Contract, the successful Bidder shall furnish to the SCA and maintain during the term of the contract, at its own cost and expense a Construction Performance Bond in an amount at least equal to one hundred (100%) percent of the contract price as security for faithful performance of the Contract; and a Labor and Material Payment Bond in an amount at least equal to one hundred (100%) percent of the Contract price for the payment of all persons performing labor on the project under the contract or furnishing materials in connection with the Contract. The surety on such bonds shall be a company authorized to do business in the State of New York and approved by the SCA. Upon request, the apparent low bidder for this project will be required to submit to the SCA/Construction Manager its bid breakdown using a Project Specific Template, within seventy-two (72) hours of the bid opening or when requested. The Contractor shall commence Work under this Contract at a date to be specified in a Notice to Proceed (NTP) letter issued by the SCA and, shall substantially complete Work on the Project, on or before 570 continuous calendar days from the date in the Notice to Proceed (NTP). The Contractor shall achieve Final Completion for the Performance Period on or before 630 continuous calendar days from NTP date. Gas Fitting or Electrical Trades and (except for HVAC) licensed to do business in the CITY OF NEW YORK in that trade. The SCA has determined that the work under this solicitation involves HVAC, Plumbing and Gas Fitting and Electrical Work. All proposed Wicks trade subcontractors must be prequalified by the SCA. However, said firm must not be disqualified, suspended, or ineligible, at the time of Bid Opening. Therefore, the Bidder must include with its bid, and in accordance with the Information for Bidders Section, the names of all its proposed Wicks trade subcontractors and estimates for each of the trades listed in the previous sentence. The Bidder must complete and submit with its bid the Wicks Subcontractor Request Form. (Appendix G). If the Bidder intends to perform the Wicks trade work with its own forces, it must include with its bid, in accordance with the Information for Bidders Section, its name, the trade(s) and an estimate for the trade(s). Bidders intending to perform electrical or plumbing work with their own forces must be properly licensed to perform this work in the CITY OF NEW YORK. If a bidder intends to perform HVAC work with its own forces, it must furnish, upon the SCA's request, evidence satisfactory to the SCA that it possesses the technical capability to perform the HVAC work in accordance with the Contract Documents. Pursuant to the provisions of the Project Labor Agreement (PLA), dated August 25, 2020, Mentor or Graduate Mentor firms may elect or decline to perform their projects under the PLA. However, pursuant to current SCA Guidelines, if the Contractors Bid Amount is over Three Million ($3,000,000) Dollars, then the Contractor and its Subcontractors of any tier performing Work will abide by the provisions of the PLA, and will have agreed to become signatory to, and to be bound by, via execution of the PLA Letter of Assent. A Mentor or Graduate Mentor Prime Contractor who is a signatory to a collective bargaining agreement with a participating PLA union shall be subject to the PLA. Bidders must complete the PLA Election or Declination attached and submit it with your bid at the time of bid opening. Failure to submit the PLA Election or Declination may deem your Firms bid Non-Responsive. Questions Regarding the Current PLA Should Be Directed to Mayra Lopez, Director of Labor Law, at Email: Mlopez8@nycsca.org or Telephone Number: (718)472-8496 Bidders can ensure their eligibility for contract award by verifying that they are currently prequalified. All inquiries regarding prequalification status should be directed to the SCAs Prequalification Dept. at (718)472-8777. Please see Appendix F Information for Bidders for information with regard to bonds and other important information that must be provided to the SCA. All questions by prospective bidders concerning this solicitation should be directed, in writing at least three (3) business days prior to the originally scheduled, or, if applicable, postponed bid opening date to rfisca@nycsca.org using the project solicitation number in the subject line as indicated in the following example: RFISCA 23-12345D-1 Smith and Jones Construction. Performance Period: 570 Continuous Calendar Days (See Page CC-3 and Appendix B) SCA24-026325-2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Subject to the SCA'sright to reject all bids, the award of the Contractshall be made to the responsible pre-qualified Bidder submitting the lowest responsive bid. Questions with regard to bid results can be directed to the Contracts Hotline by calling (718) 472-8230.

Bid Results

Laboratories

$2,477,000.00

Public - City

Renovation

66

23

8

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Grouting, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Air Barriers, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Smoke Seals
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Metal Furring, Suspension Systems, Lath, Metal Lath, Portland Cement Plastering, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment, Collection and Disposal Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Casework, Specialty Casework, Laboratory Casework, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Ducts, HVAC Fans, Air Outlets and Inlets, Diffusers, Registers, and Grilles, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators, Radiators, Convectors
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Water Utility Storage Tanks, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Clamps, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
497
Active Projects
276
Bidding Soon
4,898
All Active Projects
2,094
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

March 1, 2024

img_map_placeholder

3710 Barnes Ave, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.