BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2024 at 8:00 PM

Updated August 24, 2024

Renovation of a fire / police facility in Canton, Ohio. Working plans call for the renovation of a fire / police facility.

** As of August 23, 2024 The owner has determined a prequalified list of design build companies.** Questions should be addressed in writing to Purchasing Department, at purchasing@cantonohio.gov. Questions Deadline: 4:00 p.m., 7/24/2024 The Owner's budget for design and construction of the Project is $336,000.00, excluding legal and real estate acquisition fees and permitting fees (the "Owner's Budget"). PROJECT OVERVIEW AND OWNER BUDGET The Project is anticipated to consist of the design and construction of remove existing roof (three layers) and replace the roof on Fire Station 1 with a new membrane roof (EPDM "rubber" or approved alternate) with a 15+ year warranty. Approximately 17,772 square feet. (the "Work"). The Criteria Architect/ Engineer is James Benekos/City Engineer The City reserves the right to waive irregularities, reject any or all submissions, and conduct necessary investigations if needed. Project Location: 110 Seventh Street Southwest Canton, Ohio, 44702 Design-Build services for the Project are anticipated to include, but not necessarily be limited to: 1. Preliminary Services (design phases may be combined, as appropriate and agreed to by Owner) a. Integration of Owner's needs as set forth in the RFP and accepted suggestions throughout the design phases b. Schematic Design c. Design Development d. Construction Documents e. Preconstruction services including but not limited to constructability review and cost estimating at all phases f. Permit Acquisition / Approval g. Development and submission of a Guaranteed Maximum Price Proposal h. Prequalification of subcontractors for the Work 2. Construction Services a. Solicit bids from prequalified subcontractors and recommend subcontractors to use for the Work. b. Perform the Work through subcontractors or Design-Builder's own forces. c. Conduct construction supervision and quality assurance/quality control. d. Conduct progress scheduling / compliance assurance e. Conduct regular progress meetings f. Conduct testing, inspection, and commissioning g. Conduct Project close-out 3. Post-Construction Services a. Warranty obligations A Project Labor Agreement is or is not required on this project. YES

Final Planning

Fire / Police

$336,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
143
Bidding Soon
2,404
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2024

September 2, 2024

Project location map

110 Seventh St SW, Canton, OH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.