BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Boon, Michigan. Completed plans call for site work for a bridge / tunnel.

Road Commission for construction of the following 3 concrete box culverts: Location i: 401/2 Road East Culvert Removal and Replacement: 48 Lft of 10X 4' Concrete Box Culvert on 401/2 Road, over Mitchell Creek Location 2:40 1/2 Road West Culvert Removal and Replacement: 48 Lft of 10X 4' Concrete Box Culvert on 401/2 Road, over Mitchell Creek Location 3:31 Road Culvert Removal and Replacement: 48 Lft of 12'x 5' Concrete Box Culvert on 31 Road, over Mitchell Creek Tributary The Board reserves the right to reject any or all bids or any part of the same, to waive irregularities and/or informalities and to make the award in part or entirety in any manner deemed to be in the best interest of the Wexford County Road Commission *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Project Locations: Location 1: 40 1/2 Road East Culvert over Mitchell Creek, Cherry Grove Township, Section 8, Wexford County, Michigan. This crossing is located approximately 400' east of the 40 1/2 Road and 27 1/2 Road intersection. Description of Work: Note: High voltage power lines in vicinity of the work zone. The box culvert sections on the southern end are being produced in smaller (4 foot) segments to reduce weight and allowing the southern sections to be set by an excavator. A crane will still be required to set the northern segments. The work of this contract involves the removal and disposal of 3 - 30" CMP existing culverts and placement of 48 feet of 10' x 4'concrete box culvert at the location per the attached plans. The contractor will be responsible for all items of work listed in the Bid Proposal and shown in the plans, including dewatering, riprap, and restoration. The contractor will provide a plan to control the flow of water during construction of the box culvert. This dewatering plan must be approved by the Road Commission Engineer and the NFS prior to any construction on this project. The cost of dewatering to be included in the Lump Sum price of culvert replacement. The contractor will need to provide traffic control and may construct the structure part width while maintaining traffic or complete the project in less than 14 days of road closure time. If the contractor chooses to close the road it must be performed according to MMUTCD including Type 3 barricades and Road Closed to Through Traffic signs with advance warning at the nearest intersections and Type 3 barricades and road closed signs at the culvert location. Contractor responsible for proper signing and to maintain safe construction area at the location until the roadway is open to traffic. Soil borings for this location are included in the bid packet. Soil bores SB 3 and SB 4. WCRC has EGLE permit in file. Location 2: 40 1/2 Road West Culvert over Mitchell Creek, Cherry Grove Township, Section 8, Wexford County, Michigan. This crossing is located approximately 25' west of the 40 1/2 Road and 27 1/2 Road intersection. Description of Work: Note: High voltage power lines in vicinity of the work zone. The box culvert sections on the southern end are being produced in smaller (4 foot) segments to reduce weight and allowing the southern sections to be set by an excavator. A crane will still be required to set the northern segments. The work of this contract involves the removal and disposal of 1- 36" and 1- 30" CMP existing culverts and placement of 48 feet of 10' x 4'concrete box culvert at the location per the attached plans. The contractor will be responsible for all items of work listed in the Bid Proposal and shown in the plans, including dewatering, riprap, and restoration. The contractor will provide a plan to control the flow of water during construction of the box culvert. This dewatering plan must be approved by the Road Commission Engineer and the NFS prior to any construction on this project. The cost of dewatering to be included in the Lump Sum price of culvert replacement. The contractor will need to provide traffic control and may construct the structure part width while maintaining traffic or complete the project in less than 14 days of road closure time. If the contractor chooses to close the road it must be performed according to MMUTCD including Type 3 barricades and Road Closed to Through Traffic signs with advance warning at the nearest intersections and Type 3 barricades and road closed signs at the culvert location. Contractor responsible for proper signing and to maintain safe construction area at the location until the roadway is open to traffic. Soil borings for this location are included in the bid packet. Soil bores SB 1 and SB 2. WCRC has EGLE permit in file. Location 3: 31 Road Culvert over Mitchell Creek tributary, Cherry Grove Township, Section 4, Wexford County, Michigan. This is a seasonal road. This crossing is located approximately 3400' northwest of the 31 Road and West Lake Mitchell Drive intersection. Description of Work: The work of this contract involves the removal and disposal of 1- 36" and 1- 21" CMP existing culverts and placement of 48 feet of 12' x 5'concrete box culvert at the location per the attached plans. The contractor will be responsible for all items of work listed in the Bid Proposal and shown in the plans, including dewatering, riprap, and restoration. The contractor will provide a plan to control the flow of water during construction of the box culvert. This dewatering plan must be approved by the Road Commission Engineer and the NFS prior to any construction on this project. The cost of dewatering to be included in the Lump Sum price of culvert replacement. The contractor will need to provide traffic control and may construct the structure part width while maintaining traffic or complete the project in less than 14 days of road closure time. If the contractor chooses to close the road it must be performed according to MMUTCD including Type 3 barricades and Road Closed to Through Traffic signs with advance warning at the nearest intersections and Type 3 barricades and road closed signs at the culvert location. Contractor responsible for proper signing and to maintain safe construction area at the location until the roadway is open to traffic. No soil bores at this location. WCRC has EGLE permit in file.

Bid Results

Bridges / Tunnels

$338,310.00

Public - County

Site Work

11

3

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
193
All Active Projects
88
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2023

October 13, 2023

img_map_placeholder

Multiple Locations, Boon, MI

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.