Site work for a military facility in Somes Bar, California. Completed plans call for site work for a military facility.

Project Oak Bottom Compound Deck Replacement General Information 1.0 Background The decks, porches, railings, and stairs at the Oak Bottom Compound have suffered severe weather damage and dry rot. There are blackberry bushes and other plants and trees that have grown into and through the decks and railings. This has caused the decks, railings, and stairs to be compromised and are unsafe to use. The entryway porches have loose and missing deck boards and stair treads. The decks also have missing planks and some of the planking is too weak to stand on. 2.0 Scope of Work Cut back and de-brush all overgrowth of bushes, berry vines and small trees. Remove all decking, railings, stairs and any compromised framing and foundations of the existing decks and dispose of the debris off forest service property in a legal land fill or recycling facility. Repair any compromised areas of deck framing and foundations prior to installing the decks, railings, and stairways. Site Visit There will be no pre-bid site tour, however it is strongly advised that the Contractor thoroughly investigate the site to determine the full extent of the work and the quantities of materials needed. To make an appointment for a site visit contact Jerry McCluskey on the Six Rivers National Forest at (707) 672-3217. Contractor Requirements 3.0 Technical Requirements / Tasks Demolition: Cut back any bushes, vines or small trees that have overgrown into or through the decking. Remove all existing deck flooring, railings, cap rails, balusters, balustrades, treads, risers, and stringers and either recycle or dispose of in a landfill. Inspect all footings, piers, support columns, beams, ledgers, rim joists, joists and bridging for structural integrity and remove anything that does not meet industry standards. Construction: Replace any footings, piers, support columns, beams, ledgers, rim joist, joist and bridging that were removed. Install new deck flooring, railings, cap rails, balusters, balustrades, treads, risers, and stringers. Preferred Materials: Trex Transcend Composite Decking - Spiced Rum - 1" Square Edge Board (or equal, see specifications for salient characteristics). Trex Transcend Horizontal Railing (or equal, see specifications for salient characteristics): Components: Post Sleeve Skirt Post Sleeve Post Sleeve Cap Top Rail Bottom Rail Square Balusters All Necessary Hardware

Post-Bid

Military

$250,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
28
Bidding Soon
300
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

September 8, 2023

Project location map

To Be Determined, Somes Bar, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed