Demolition, site work, paving and new construction of a bridge / tunnel in Manning, South Carolina. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Travelers driving across South Carolina's largest lake may soon do so more safely after the state received federal funding for a badly needed bridge replacement project. The state is set to embark on major work to replace four bridges carrying Interstate 95 traffic over Lake Marion in the central part of the state. The new bridge could affect travelers across the country: I-95 is a main artery that ties together the Eastern Seaboard. In a July 17 announcement, the S.C. Department of Transportation revealed it had received $175 million in federal funding to complete the project. The South Carolina Department of Transportation (SCDOT) proposes to replace the four bridges along I-95 over Lake Marion in Clarendon and Orangeburg Counties. This includes the large two-lane northbound and southbound bridges over Lake Marion and the smaller two-lane northbound and southbound relief bridges over the lake. The Lake Marion relief bridges provide an overflow for Lake Marion to the north of an existing causeway. Additionally, the replacement of the existing I-95 Lake Marion southbound vehicular bridges would include the construction of a new two-way pedestrian and bicycle facility. The adjacent existing US 301 pedestrian bridge (currently closed to all traffic) would be retained. The proposed Bridge Replacements would include: Removal of the existing northbound and southbound I-95 bridges once the new structures are complete. Removal of abandoned in-water wooden pilings to the west of the current I-95 bridges and east of the US 301 bridge. Two 12-foot travel lanes would be provided in both the southbound and northbound directions. A 10-foot minimum inside shoulder (shoulders may be wider due to staging requirements) and 12-foot outside shoulder would be provided. There will be a barrier separated 14-foot shared use path for pedestrians and bicyclists on the southbound bridge only. The bridge deck widths would be large enough to accommodate an additional 12-foot travel lane in the future, if needed. As of August 26, 2024, per owner, construction has not started on the project. It is being delivered as a Design-Build contract. Procurement is scheduled to begin in quarter 4 of this year. Contract should be underway in quarter 4 of 2025. The Engineer of Record will be a part of the future Design-Build team. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Bridges / Tunnels
$257,600,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2025
I-95, Manning, SC
Related To This Project
Manning, SC
Bid Date: Dec 20 2023
Manning, SC
Bid Date: Jan 03 2024
Manning, SC
Bid Date: Oct 20 2023
Manning, SC
Bid Date: Nov 14 2023
Manning, SC
Bid Date: Nov 02 2023
Manning, SC
Bid Date: Nov 30 2023
Manning, SC
Bid Date: Nov 02 2023
Manning, SC
Bid Date: Dec 20 2023
Manning, SC
Bid Date: Sep 07 2022
Manning, SC
Bid Date: Aug 16 2022
Manning, SC
Bid Date: Mar 29 2022
Manning, SC
Bid Date: Feb 21 2022
Manning, SC
Bid Date: Apr 05 2022
Manning, SC
Bid Date: Feb 08 2022
Manning, SC
Bid Date: Sep 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.