Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Groveland, Florida. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
As of August 28, 2024, an engineer has been selected and this project is in the preliminary design phase. It is anticipated construction will start in 2028. FPID 435787-1 FPID 435787-2 Florida’s Turnpike Enterprise, part of the Florida Department of Transportation (FDOT), is planning to widen Florida’s Turnpike Mainline/SR 91 from the US 27 (Milepost (MP) 289.3) to the CR 470 interchange (Milepost (MP) 297.3) from a four-lane divided expressway to an eight-lane divided expressway. This project will provide additional capacity to meet future traffic demand, improve emergency evacuation times, and improve safety within the corridor. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 08 Selection Method : Letter of Response and Oral Presentation Project Description : Widen TPK Mainline -US 27 to I-75 MP 289-308 Plain Language Description : Widen TPK Mainline - US 27 to I-75 MP 289-308 Advertisement Date 8/08/2023 Response Deadline Date/Time 8/22/2023 02:30 am Longlist Date/Time 9/07/2023 11:30 pm Shortlist Selection Date/Time 9/19/2023 06:30 pm Technical Review Committee Meeting 1 Date/Time 10/18/2023 12:30 am Oral Presentation Date/Time 10/18/2023 Final Selection Date/Time 11/07/2023 07:30 pm Negotiations Period Begin Date 11/10/2023 Negotiations Period Ending Date 1/19/2024 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Widen Tpk Mainline -us 27 to I-75 Mp 289-308
Design
Roads / Highways
$50,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2028
US-27, Groveland, FL
Related To This Project
Groveland, FL
--
Groveland, FL
--
Groveland, FL
Bid Date: Oct 31 2023
Groveland, FL
--
Groveland, FL
Bid Date: Oct 26 2023
Groveland, FL
--
Groveland, FL
--
Groveland, FL
Bid Date: Nov 08 2023
Groveland, FL
Bid Date: Aug 01 2023
Groveland, FL
Bid Date: Jul 11 2023
Groveland, FL
Bid Date: Apr 18 2023
Groveland, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.