EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 12, 2023 at 8:00 PM

Updated October 1, 2024

Renovation and addition to a mixed-use development in Kenilworth, New Jersey. Completed plans call for the addition of a 21,840-square-foot, two-story above grade educational facility; and for the renovation of a educational facility.

New 2-Story Addition to be constructed at the west end of the existing school with a Middle School main entrance and drop-off area at Monroe Avenue. A new 2-story link will connect the addition to the existing building. The addition will house both Middle and High School grades with Science Labs on the 1st floor and general classrooms and Administration Office Area on the 2nd floor, for a total gross square feet of 21,840 SF. An Athletic Lobby addition will be constructed at the south side of the existing school off the Gymnasiums, with outdoor ramp and stair access. Interior alterations include classrooms on the 2nd floor, converting the existing Auxiliary Gym to a Multi-purpose Room with HVAC replacement, and finishes upgrades at the Auditorium. Reconstruction of surrounding sports fields will be provided. Harding School - Finishes Upgrades at the Auditorium with HVAC replacement. Electronic Bid documents can be purchased for a non-refundable fee of fifty ($50) dollars by contacting SSP Architects by phone at (908) 725-7800 or by email at Bids@ssparchitects.com. Site visits at any other time must be arranged at least one business day in advance through Justin Connoly ; 908-358-2749. Any questions or requests for clarifications shall be submitted in writing to the Architect's office no later than Noon September 7, 2023 by emailing rsantangelo@ssparchitects.com The Owner and Architect have determined that only DPMC Trade Classifications listed below are deemed eligible to bid this project. C009 General Contractor/ Additions and Alterations Each bidder must deposit with his Bid, a security in the amount of not less than 10% of the Bid, but in no case to exceed $20,000, in the form of a certified check or standard bid bond and subject to the conditions provided in Section B: "Instructions to Bidders". The successful bidder will be required to furnish a Performance Bond in the amount of 100% of the contract and satisfactory in form, execution and sufficiency of surety. All bidders are required to comply with the requirements of N.J.S.A. 10:5- 31 et seq., Affirmative Action Against Discrimination (N.J.A.C. 17:27-1 et seq.), Executive Order 11246 regarding Equal Employment Opportunity, and Chapter 33, Laws of 1977, regarding Disclosure of Partners and Stockholders. A non-collusion affidavit, certificate of pre-qualification, and affidavit as to total amount of uncompleted contracts must accompany each bid. All contractors are subject to background checks. Refer to Section B - Instructions to Bidders for additional information. All bids shall be irrevocable, not subject to withdrawal and shall stand available for a period of (60) sixty days. 23-8872, 22-0239

Award

Educational

$14,700,000.00

Public - City

Addition, Renovation

209

34

44

6

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Manufacturer?s Field Services, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Demolition, Building Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Membrane Roofing, Modified Bituminous Membrane Roofing, Flashing and Sheet Metal, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Fire-Resistant Joint Sealants, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Wood Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Tackboards, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Floor Mats, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Commissioning of Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
535
Active Projects
334
Bidding Soon
5,418
All Active Projects
2,386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2023

December 4, 2023

img_map_placeholder

426 Boulevard, Kenilworth, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Additions and Alterations at Kenilworth Schools

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.