Published September 8, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in King of Prussia, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

The project generally consists of the removal of the existing sludge conveyance equipment and installation of a new pug mill, lime feeder, and sludge conveyor, installation of all required support modifications, structural modifications, as well as electrical and control modifications. The Work will be performed under two Contracts as follows: Contract One - General Construction Contract Two - Electrical Questions will be accepted until 4:00 PM, prevailing time, on Friday, August 25, 2023; The apparent low bidder and the next two (2) lowest bidders must submit, to the Engineer, originals of the Bidding Documents within two (2) business days from the date of the bid opening. Reproduction of the Bidding Documents and placement on web sites other than PennBid, is not permitted. Bids may be modified or withdrawn at any time prior to the opening of Bids. After the Bid opening, Bids may be withdrawn only by complying with Commonwealth of Pennsylvania laws and regulations. A summary of such laws and regulations is given in the Instructions to Bidders (Document 00100). Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. See Instructions to Bidders for other provisions on the time available for acceptance of Bids. The Contract will be subject to the Prevailing Minimum Wage Determination established by the Commonwealth of Pennsylvania, Department of Labor and Industry. Each Bid must be accompanied by Bid security in the form of a certified check, bank check, irrevocable letter of credit, or Bid bond (on the form included with the Bidding Documents) for 10 percent of the Bid total. It is a requirement of this Contract that at least 50% of the Work be performed by prime Bidder's own work force, not by subcontractor(s). It is a requirement of each Contract that Bidder shall have a minimum (5) year, (5) project documented experience in the type of Work required by this Project. Bidders, subcontractors, their workers and any persons providing labor and products to the Project shall be persons lawfully permitted to work in the United States and the Commonwealth of Pennsylvania. As a precondition of being awarded a Contract, Successful Bidder, and its subcontractor(s) are required, to provide confirmation of compliance with Act 127 of 2012, the "Public Works Employment Verification Act". UPPER MERION TOWNSHIP hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, or irregularities in any Bid. Project generally consists ofremoval of existing sludge conveyance equipment and installation ofnew sludge conveyance equipment within existing sludge dewatering building at the Trout Run Water Pollution Control Center, including all appurtenances, supporting equipment, demolition, controls, and hardware for a complete and operable sludge conveyance system. This equipment shall include a new pug mill mixer, a new screw conveyor, and a new lime feed system.

Bid Results

Water / Sewer

$36,133.00

Public - City

Renovation

9

23

7

5

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Electricity, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions
Division 03 - Concrete

Division 03 - Concrete

Grouting
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Batching Equipment, Mixers
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
415
Active Projects
239
Bidding Soon
3,700
All Active Projects
1,799
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

October 2, 2023

img_map_placeholder

900 Mancill Mill Rd, King of Prussia, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pug Mill/sludge Conveyor/lime Feeder Equipment Trout Run Water Pollution Control Center - General/Mechanical and Electrical Contracts

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.