BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Dayton, Texas. Completed plans call for site work for a water / sewer project.

The purpose of the geotechnical study was to explore the project site's subsurface soil and groundwater conditions, and to develop geotechnical recommendations for the stormwater detention ponds. The scope of services included the following: 1. Field exploration program consisting of 29 soil test borings advanced to depths of 20 to 45 feet below ground surface to evaluate the subsurface soil and groundwater conditions. 2. Laboratory tests on recovered soil samples to evaluate soil index and strength properties. 3. Geotechnical report summarizing the findings and providing geotechnical design and construction recommendations. River Ranch One Investments Ltd. contracted Tolunay-Wong Engineers (TWE) to perform a geotechnical study for the design and construction of stormwater detention ponds within the planned River Ranch residential development. The overall project tract covers in excess of 1,000 acres and is located approximately 2 miles east of Grand Parkway (SH 99), and directly east of North Highway 146 in Liberty County, Texas. The tract is traversed by East Prong Old River running north-south and is bound by a drainage ditch (Big Ditch) to the south. This study was performed in accordance with TWE Proposal No. P23-E214 dated May 16, 2023, and was authorized by Paul Connor as Manager of RR I GP, LLC, the GP of River Ranch One Investments, Ltd on May 19, 2023. This phase of the project addresses several stormwater detention ponds with planned maximum depths varying from 15 to 24 feet. The Owner reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of 90 days from the date bids are opened. For construction contracts $50,000 and over but less than $250,000, the bidder shall submit a certified or cashier's check on a responsible bank in the State equal to two percent (2%) of the maximum total bid amount. For construction contracts over $250,000, the bidder shall submit either a 2% certified or cashier's check or five percent (5%) bid bond of the maximum total bid amount. Make the cashier's check or bid bonds payable to the Owner. Scope of Work of the Contract includes Construction of Pipes and Outfalls in River Ranch Phase 3. Bidder must be capable of executing a satisfactory performance bond and payment bond for 100 percent (100%) of the contract sum in accord with the conditions of the contract. The work shall be substantially completed within 45 calendar days from date of Notice to Proceed.

Post-Bid

Water / Sewer

$1,400,000.00

Public - County

Site Work

26

23

91

4

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
322
Active Projects
208
Bidding Soon
4,116
All Active Projects
1,721
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 29, 2023

October 30, 2023

February 7, 2024

img_map_placeholder

Multiple Locations, Dayton, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.