BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Webster City, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The 2023 Sanitary Sewer Rehabilitation locations for the water main repairs were determined by the City and within the City's budget amount. The locations were determined by information from the City, conditions of the existing storm or sanitary pipe, and the City's budget amount. The project will include eleven (11) locations with two (2) alternate locations briefly described below: MAPLE AVENUE - J13-05 (DEAD END) TO J13-10: Sanitary sewer replacement from MH J13-10 to J13-05 (Dead End). Includes patching back with PCC pavement. RODLYN ROAD - G17-25 TO G17-20: Sanitary sewer spot repair. Includes patching back with PCC pavement. WALNUT STREET - G14-215 TO G14-210: Sanitary sewer spot repair. Includes patching back with PCC pavement. CIPP lining of the sanitary sewer will be performed at the following locations. Location CIPP Lining of Sanitary Sewer Main Superior St near Pleasant St MH I16-80 to MH I16-85 Bell Ave to High St MH J14-30 to MH J14-25 Crestview Dr near Rodlyn Rd MH H18-100 to MH H18-95 Ohio St near Des Moines St MH H16-115 to MH H16-120 Kamen Dr south of Fairmeadow Dr MH G18-45 to MH G18-50 Locust St east of College St MH F16-10 to MH F16-15 Maple Ave near Willow St MH J13-20 to MH J13-25 Walnut St near Willson Ave MH H15-25 to MH H15-30 Bid Alternate #1 KATHY LANE - G15-145 TO G15-150: Sanitary sewer spot repair on Kathy Lane near Sunset Drive. Includes patching back with PCC pavement. BID Alternate #2 MACKINLEY KANTOR DRIVE - MH E12-15 TO MH E12-10: Sanitary sewer spot repair. Includes patching back with granular surfacing. The Professional will prepare staging plans to maintain traffic at applicable locations to be determined by the City, limit lane closure, and reduce inconveniences for the public. Spot repairs will require full closures and detour. The Professional will make field measurements for plan preparation. The scope of the Project will be adjusted to meet the City's available budget and prioritization. This includes any field revisions that may be necessary based on pre-construction cleaning and televising of each line. The Professional and the City will coordinate the scope of work and repair locations for inclusion in the construction drawings. Est. Completion Date: June 28, 2024

Post-Bid

Roads / Highways

$232,800.00

Public - City

Paving, Site Work

18

6

4

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
38
Bidding Soon
575
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2023

October 4, 2023

img_map_placeholder

Multiple Locations, Webster City, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.