BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2024 at 8:00 PM

Updated May 30, 2024

Site work and paving for a mixed-use development in Flushing, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Rehabilitation of South Cherry Street from Riverview Park to Main Street in the City of Flushing, Genesee County, Michigan. Work includes cold milling, pavement removal, pavement repairs, HMA paving, and pavement markings. Proposal in the interest of the Owner. Principal items of work include but are not limited to: 330 Ton HMA, 13A 2,503 Syd Cold Milling 34 Ton Hand Patching 502 Ft Pavement Markings Drawings, Specifications, and other Contract documents for submitting a bid must be obtained upon application at the office of ROWE Professional Services Company, upon the payment of $40 per set for prints, or $30 for portable document format (PDF) files which can be obtained after completing the Request Bid Package form found at online. Question Deadline 04/16/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email Ryan Bair at RBair@RowePSC.com

Award

Roads / Highways

$89,225.00

Public - City

Paving, Site Work

11

8

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
167
Bidding Soon
2,361
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

July 8, 2024

Project location map

S Cherry St, Flushing, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.