BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a service station / car wash facility in Augusta, Maine. Completed plans call for site work for a service station / car wash facility.

**As of October 30, 2024 this project has not yet been awarded. A timeline for award has not yet been established. The Maine Army National Guard (MEARNG) plans to install electric vehicle supply equipment (EVSE - charging stations) throughout the state of Maine to support all-electric vehicles (EV) and plug-in hybrid electric vehicles (PHEVs). All work to be done in accordance with plans and specifications prepared by Innovative Construction and Design solutions, LLC (ICDS). The Maine Army National Guard (MEARNG) plans to install electric vehicle supply equipment (EVSE - charging stations) throughout the state of Maine to support all-electric vehicles (EV) and plug-in hybrid electric vehicles (PHEVs). The cost of the work is approximately $ 500,000. The contract shall designate the Substantial Completion Date on or before 30 September 2024, and the Contract Final Completion Date on or before 31 December 2024. Bid security is required on this project If noted above as required, the Bidder shall include a satisfactory Bid Bond (section 00 43 13) or a certified or cashier's check for 5% of the bid amount with the completed bid form submitted to the Owner. The Bid Bond form is available on the BGS website. 4. Performance and Payment Bonds are required on this project. If noted above as required, or if any combination of Base Bid and Altemate Bids amounts selected in the award of the contract exceeds $125,000.00, the selected Contractor shall fumish a 100% contract Performance Bond (section 00 61 13.13) and a 100% contract Payment Bond (section 00 61 13.16) in the contract amount to cover the execution of the Work. Bond forms are available on the BGS website. Deadline for questions is 12:00 Noon 24 August 2023. Questions about this project should be addressed to: Mr. Ralph Turner, PE DFE Facilities Engineer/Project Manager ralph.f.turner4.nfg@army.mil Cell: 207-831-2182 Owner Furnished Equipment Point of contact: Bob Spatz, President Carbon Day EV Charging 163 S Wheeling Road Wheeling, IL 60090 518-505-0508 bobs@carbondayevcharging.com Bidders are strongly advised to contact Mr. Spatz to discuss the procedure for becoming a Chargepoint "qualified" installer and any other questions about the owner furnished equipment. Question and comment deadline of 5:00 p.m. on 30 August 2024.

Post-Bid

Service Station / Car Wash

$450,000.00

Public - State/Provincial

Site Work

27

11

4

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
12
Bidding Soon
315
All Active Projects
96
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.