Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 24, 2023 at 8:00 PM
Updated November 9, 2024
Site work for a water / sewer project in West Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.
All bidders must file a "Bidders Proof of Responsibility Form" with the Village Engineer on or before 4:00 P.M. on August 17, 2023. \ A Certified check or bid bond payable without condition to the Village of West Milwaukee in an amount not less than five percent (5%) of the bid shall be submitted with each bid as a guarantee that if the bid is accepted, a proper contract and bond will be executed and filed within ten (10) days after the acceptance of the bid. If such bidder fails to execute and file such contract and bond, the amount of the check or bid bond shall be forfeited as liquidated damages. No bid shall be withdrawn after the opening of bids without the consent of the Village of West Milwaukee for a period of sixty (60) days after the time of opening bids. Each bidder agrees upon submission of bid that if the same be accepted within said time period, he shall be bound by the terms of acceptance hereinafter contained. The Village of West Milwaukee reserves the right to reject any or all bids received or to accept any bid which may be to the best interest of the Village of West Milwaukee. Each successful bidder will be required to furnish a satisfactory performance bond in the sum of the full amount of the contract. Bids shall include the furnishing and installation of all labor, materials, permits, equipment, tools, supplies, etc., for the 2023 Utilities Rehabilitation Program. \ Approximate quantities of work to be expected are as follows: 4,292 LF - 8" Dia. CIPP Liner \ 274 LF - 10" Dia. CIPP Liner \ 541 LF - 15" Dia. CIPP Liner \ 116 LF - 24" Dia. CIPP Liner \ 164 LF - 27" Dia. CIPP Liner \ 118 EA - Test & Seal Lateral Connection \ 5 LF - 8" Dia. CIPP Spot Liner \ 6 LF - 15" Dia. CIPP Spot Liner \ 2 EA - 8" Dia. Sanitary Sewer Spot Repair \ 4 EA - Lateral Cleaning from Mainline \ 11 EA - Sanitary Manhole Replacement \ 6 EA - 6" Gate Valve & Box \ 23 EA - 8" Gate Valve & Box \ 125 LF - 6" Dia. D.I. Water Main \ 105 LF - 8" Dia. D.I. Water Main \ 7 EA - Hydrant \ Together with appurtenant construction in all contracts. \ All bids must be prepared as described in the Instructions to Bidders and filed electronically via the online electronic bid service.
Bid Results
Water / Sewer
$898,266.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 23, 2023
September 18, 2023
Multiple Locations, West Milwaukee, WI
Related To This Project
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed