BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Edgartown, Massachusetts. Completed plans call for site work for a water / sewer project.

Responders must be willing to enter into the Town of Edgartown's standard form contract, provided as APPENDIX H to the Project Documents. The contract will include the scope of services documentation provided as a part of the bid package. Simultaneously with the delivery of the executed contract, the Contractor shall furnish a Payment Bond in an amount equal to Fifty Percent (50%) of the total Contract Price as security for the payment of all persons performing labor on the project under this contract, and furnishing materials in connection with this Contract. The surety on such bond shall be a duly authorized surety company, licensed to do business in the Commonwealth of Massachusetts. Installation of floating siltation curtain to prevent the dispersion of sediments disturbed by demolition and construction activities. Debris boom and siltation curtain shall be left in place during all pile driving, demolition, and construction activities as required by the included permits and licenses. An Awarding Authority must request an updated wage schedule if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date. Each reference shall be no more than 2 pages in length each. The projects should outline the total scope of the project, the scope executed by the bidder, similarities to this proposed project, and a reference person. The projects should outline if they are municipally funded and executed. This contract includes the furnishing of all equipment, materials, labor and supervision necessary to carry out the installation of a new seawall encasement system in front of the existing stone seawall a North Wharf in Edgartown, MA. The required work shall include but is not necessarily limited. The scope of the work, without limiting the generality thereof, consists of furnishing all labor, materials and equipment for the following items of work and all work incidentals thereto as shown on the Drawings and as herein specified. The Town of Edgartown reserves the right to reject any and all bids and to waive any informality in bids received whenever such rejection or waiver is in its best interest

Award

Water / Sewer

$1,694,637.00

Public - City

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
105
Bidding Soon
1,794
All Active Projects
743
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2023

November 3, 2023

img_map_placeholder

1 Morse St, Edgartown, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.