BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 22, 2025

Site work and paving for a mixed-use development in New York, New York. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Port Richmond Wastewater Resource Recovery Facility (WRRF) is located at 1801 Richmond Terrace, Staten Island, NY 10310. Port Richmond WRRF utilizes the sludge dock within the Kill Can Kull to offload sludge to and from the facility into NYCDEP vessels. The Rockaway WRRF is located at 106-21 Beach Channel Drive, Rockaway, NY 11694 on the Rockaway Peninsula. The receiving waterbody to offload to and from the NYCDEP sludge vessels is Jamaica Bay. The Port Richmond and Rockaway WRRF Sludge Dock Improvements project (PR-132 and R-151) includes facility planning, design and construction of the sludge docks to a state of good repair. New York City Department of Environmental Protection (DEP) is procuring under this RFP, a Design-Builder to enter into a design-build contract to execute this Project. Previous above water and underwater inspections of both sludge docks have determined that Port Richmond WRRF and Rockaway WRRF should be replaced/rehabilitated to allow the facilities to continue sludge transfer operations. Both facilities are in continuous daily operation, and the execution of this project must be performed within work restrictions without interrupting sludge transfer and other critical functions of facilities. The Design-Builder shall provide all resources and professional services to perform the planning, engineering design, permitting, furnishing of all materials, fabrication/installation, labor, as well as the means and methods for demolition and construction necessary for the construction of the PR-132 and R-151 Sludge Docks Improvement Projects at Port Richmond WRRF and Rockaway WWTP, under a Design-Build Agreement. The project scope focusing on the Port Richmond WRRF sludge dock, includes the following: Replacement of the existing sludge dock; Replacement and widening of the causeway; Installation of 20-inch sludge line and associated supports; Installation of two (2) new 12-inch sludge lines from the 20-inch line to gooseneck connectors; Replacement of the existing plunger desludging line pump in the nearby sludge storage tank building; Installation of new 12-inch gooseneck connectors and valves at sludge loading area of the dock; Heat tracing of 12-inch sludge line and gooseneck connectors; Installation of new heat-traced potable water line to the new dock area; Upgrade lighting on dock and causeway; Installation of new LED lights along the causeway, dock, and walkways; Replacement of the existing load center and supports on the new dock; 2 Exhibit A RFP Data Sheet Installation of electrical equipment along the dock, causeway, and walkways including lighting, transformer and panelboard, shore power receptacles, insulated heat tracing; and other miscellaneous ancillary systems; and Installation of new dock camera system. The project scope for Rockaway WRRF dock includes the following: Demolition of the existing bulkhead, mooring anchors, and fender system and upland dock as required to accommodate associated marine structures, mechanical equipment, and electrical equipment; Construction of a new dock bulkhead with concrete cap and a new fender system matching the top of existing dock outboard of the new bulkhead; Installation of a new ductile iron pipe sludge line along the causeway and dock and installation of two sludge manifolds and gooseneck connectors; Installation of new heat-traced potable water line and hydrants leading out to the dock; Installation of electrical equipment along the dock, causeway, and walkways including shore power receptacles, insulated heat tracing; and other miscellaneous ancillary systems; Installation of new dock camera system; and Repair of existing plant outfall within dock boundaries as needed. structures and sludge lines to support sludge operations during construction. Question Deadline 09/03/2025

Post-Bid

Water / Sewer

$180,000,000.00

Public - City

Paving, Site Work

48

34

12

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,020
Active Projects
526
Bidding Soon
7,791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2025

March 31, 2026

Project location map

Multiple Locations, New York, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.