Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 21, 2023 at 8:00 PM
Updated July 1, 2025
Site work and paving for a transportation facility in Worcester, Massachusetts. Completed plans call for site work for a transportation facility.
Question Deadline 08/24/2023 at 12:00 PM ET Questions may be sent via email to CPBidQuestions@massport.com Estimated project cost: $8 million. This RFQ includes specific scope for the following 4 projects: (1) Replace Runway 29 Departure EMAS (R/W 11 End), (2) Replace Runway 11 Departure EMAS (R/W 29 End), (3) Construct Replacement Taxiway F from Runway 11-29 to the Taxiway D intersection with Boundary Marking Modifications at the Terminal Ramp, and (4) Rehabilitate the Entrance and Exit passenger roadway to the Terminal. The Supplemental Information Package will provide detailed information about Scope of Work, Selection Criteria and Submission Requirements. The Authority is seeking qualified multidiscipline consulting firm or team, with proven experience to provide professional engineering services for planning, design, and construction, including resident inspection for its airfield capital improvement projects. The Consultant must be able to work closely with the Authority and other interested parties in order to provide such services in a timely and effective manner. Included with this scope would be the replacement of the existing yellow delineators that project the perimeter to the bed and all of the characteristics of the EMAS products such as the latest generation blocks, seam seal, and deflector shield. Estimated project cost: $3.5 million The contract will be work order based, and Consultants fee for each work order shall be negotiated; however, the total fee for each contract shall not exceed ONE MILLION FIVE HUNDRED THOUSAND DOLLARS ($1,500,000) per project
Post-Bid
Transportation Terminals
$80,000,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 21, 2023
January 22, 2024
375 Airport Dr, Worcester, MA
Related To This Project
Worcester, MA
Bid Date: Aug 31 2023
Worcester, MA
Bid Date: Aug 31 2023
Worcester, MA
Bid Date: Sep 19 2023
Worcester, MA
Bid Date: Sep 22 2023
Worcester, MA
Bid Date: Sep 06 2023
Worcester, MA
Bid Date: Oct 13 2023
Worcester, MA
Bid Date: Oct 19 2023
Worcester, MA
Bid Date: Sep 27 2023
Worcester, MA
Bid Date: Aug 30 2023
Worcester, MA
Bid Date: Oct 04 2023
Worcester, MA
Bid Date: Aug 31 2023
Worcester, MA
Bid Date: Aug 30 2023
Worcester, MA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.