BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2023 at 8:00 PM

Updated January 27, 2024

Renovation of a municipal facility in Hampton, Georgia. Completed plans call for the renovation of a municipal facility.

Question Deadline 09/06/2023 at 5:00 PM ET All questions concerning this eRFQ must be submitted in writing via email to the Issuing Officer Kaycee Larson klarson@gsp.netr The roof is 40 feet x 80 feet, and the current roofing material is metal. Bidders are responsible for exact measurements. The contractor shall provide all equipment, tools, labor, supervision, permits, & other necessary things to complete the TPO roof replacement. All cleanup of roof work and debris removal is the responsibility of the awarded Supplier/Vendor. DPS needs a new TPO roof installed on the Hampton Scale Barn. The roof is 40' x 80', and the current roofing material is metal. The contractor shall provide all equipment, tools, labor, supervision, permits, & other necessary things to complete the TPO roof replacement. All cleanup of roof work and debris removal is the responsibility of the awarded Supplier/Vendor. Work shall begin within 60 days of award notice and be completed within 30 days. A written 20-year manufacturer material and labor warranty shall be provided prior to final invoice. Description: o Supplier shall provide plywood and tarps to protect landscape and outdoor fixtures. o Supplier shall remove and dispose of 4 existing fiberglass skylights. o Supplier shall install new r-panel to close existing skylights. o Supplier shall install 2x4 wood nailer around entire perimeter. o Supplier shall install EPS flute fill insulation to provide a level roof surface. o Supplier shall mechanically fasten 1.5" ISO board insulation with an R value of 9 over the EPS flute fill. o Supplier shall mechanically fasten a 60-mil white TPO membrane over the ISO board insulation system using piranha plates and screws into metal purlins per manufacturer specs. o Supplier shall seal TPO system with hot air weld application. o Supplier shall install split pipe seal flashings around all plumbing pipes. o Supplier shall install a TPO 24-gauge metal drip edge on all roof drainage edges. o Supplier shall complete flat roof with all necessary accessories like T-joint covers and premade TPO corners. o Supplier shall prefabricate and install an HVAC boot to all the vent pipes from TPO unreinforced membranes. o Supplier shall ensure all the roof system components are installed to meet specifications. o Supplier shall walk a magnetic sweeper around the property and driveway to ensure all nails from roof are disposed of properly.

Award

Municipal

$35,329.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
111
Bidding Soon
2,113
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2023

October 11, 2023

Project location map

30 Little John Trail, Hampton, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.