BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a golf course in Lake Ariel, Pennsylvania. Completed plans call for site work for a golf course; and for paving for a golf course.

The Hideout POA is soliciting a sealed quote relative to excavating and repaving the Golf Course cart paths on hole #7 & #8 at Golf maintenance located at 4511 North Fairway Dr located within the Hideout Development, Lake Township, Wayne County Pennsylvania 18436. CLARIFICATION DEADLINE 9/1/2023 4:00 PM Bidder shall submit all questions about the meaning or intent of the Bidding Documents via the "Clarifications" feature in PennBid Quotes received by The Hideout for the project will be reviewed and investigated prior to the award of the contract. Once completed, the contract will be awarded to the most responsible bidder. The Hideout has the right to reject, modify, or re-request quotes on any and all submitted quotes. Any bid over fifty thousand dollars ($50,000) must be bonded. Review attached contract for required bonding and insurance information. The POA reserves the right to reject any or all bids or portions thereof or to waive any informalities in the bidding. The Association of Property Owners of The Hideout, Inc. is an equal Opportunity Employer and all qualified Bids of contractors will receive equal consideration without regard to Race, Color, Religion, Creed, Ancestry, National Origin, Gender or Sexual Orientation. The project briefly described is: Golf Course Cart Paths 7&8 1. Excavate Approximately 3250ft in length and widen to 8 ft. 2. Excavate work site and grade work site 3. Add 6in of new modified base 4. Install 2-2 1/2 asphalt. 5. Seed and hay all areas surrounding the work site. Detailed Scope of Work: 1. Removal and Demo: o Excavate the cart path on hole #7 & 8 2. Assemble and Install: o Install 6in of modified base o Install 2-21/2 in of asphalt o Roll out pavement o Seed and hay areas surrounding construction. 3. Material Disposal: o Contractor is responsible for removal of all equipment and construction debris related to construction off Hideout properties or may use aspen point to dispose of earth material only. 4. Replacement: o Replace any damage area from construction to original state o Restore deck liner. o Contractor will replace any items damaged outside of the demolition of the approved construction site. o Backfill excavation site with self-compacting material. Fill cannot have refuse material. 5. Other: o Contactor will provide insurance and license to work o Provide proposal for material and work o Warranty for contractor work and product must be provided. o Contractor is responsible for clean-up and restoring area pre-construction. o Contractor will restore any fencing, landscaping, concrete, or any other area not listed that was removed or damaged due to construction back to pre-construction appearance. o All town, county and state permitting to be processed and completed by contractor o Any bid over 50K must be bid-bonded o Contractor will follow OSHA standards.

Bid Results

Golf Course

$148,400.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
273
Bidding Soon
3,744
All Active Projects
1,570
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 8, 2023

October 1, 2023

img_map_placeholder

4511 N Fairway Dr, Lake Ariel, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.