BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Squamish, British Columbia. Contact the soliciting agency for additional information.

The proposed contract is funded by the Forest Investment Program (FIP). It consists of supervising reforestation activities and silviculture surveys on the Boulder Creek Fire in the Upper Lillooet area within the Sea to Sky Natural Resource District. Contract activities include: Implementation of a fill plant comprising approximately 60 hectares (ha) planned for fall 2023; Preparing tree planting maps for the implementation of the fill plant (contract PL24LMN216); Silviculture surveys (assessing growth, stocking, monitoring brush, scheduling next survey) on approximately 230ha; Potential layout for areas to be planted in future years as identified as not sufficiently restocked during fall field surveys; Preparing maps for completing surveys and compilations for RESULTS submission; Submission of office deliverables including pay certifications, maps, survey compilations; and RESULTS reporting for tree planting and surveys activities. Tree planting contract supervision and planting quality inspection for 49,080 trees (~60ha) is expected occur between September 15th and October 15th. Exact start date for planting implementation is dependent on precipitation and soil moisture recharge. Any activities associated with the tree planting fill plant this fall will be cancelled should the drought worsen and there is insufficient fall precipitation to support tree establishment and growth. The Boulder Creek Fire is approximately a 1-to-1.5-hour drive from Pemberton. Access to sites are a combination of road (truck 4x4 and ATV) and helicopter access. Helicopter access is due to the Meager Creek slide. Use of helicopter is required for approximately 20 ha of the 2023 fill plant and 60 ha of 2023 silviculture surveys. During high landslide risk periods, or for wildlife closure, the gate on the Lillooet Creek FSR may be locked; a gate key will be provided only if safe access is available. The fall 2023 tree planting contract (PL24LMN216) includes road brushing and danger tree assessing/falling and therefore should improve access for surveyors. Subject to satisfactory performance and funding, this contract has an option to renew which consists of silviculture surveys on the Boulder Creek fire for 2024 and 2025. The estimated contract period will be 6 month(s).

Post-Bid

Conservation and Development

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
38
Bidding Soon
1,277
All Active Projects
529
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2023

October 4, 2023

img_map_placeholder

Multiple Locations, Squamish, BC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.