Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Poplar Bluff, Missouri. Working plans call for the renovation of a medical facility.
Pre-Solicitation Notice Project Number 657A4-23-770 Repair Cooling Tower 2 NCO15 Contracting is asking for responsible vendors to meet the attached statement of work. This is a total set-aside for all SDVOSB vendors. The vendors must meet all evaluations factors as indicated in the solicitation document. The Statement of Work is for performance of work associated with construction documents for the project 657A4-23-770 Repair Cooling Tower 2 at the John J. Pershing VA Medical Center, located at 1500 North Westwood Boulevard, Poplar Bluff, MO 63901. The contractor shall provide all services, materials, labor, supervision, safety, certification and expertise for items described in the provided Construction Documents; drawings and specifications. Work shall be phased in a manner that is not disruptive to Medical Center Operations. Contractor shall remove and replace all leaking components to include the complete coil assembly and associated piping connections in cooling tower 2 (Building 1 roof over penthouse). Contractor shall provide all materials and means necessary to complete the service. In order to properly remove and replace said components, contractor shall isolate chiller 2 (Building 1 penthouse) by means of removing R-134a refrigerant, sealing refrigerant piping and circuits and maintaining a nitrogen charge to all refrigeration piping and circuits A and B to prevent moisture contamination of all refrigeration piping to include circuits A and B during the scope of the Project. Contractor must maintain operation of chiller 1 and cooling tower 1 during construction. Contractor shall also isolate and drain condensing water piping necessary to complete the replacement of the leaking component to include the refrigerant coil on cooling tower 2. Refrigerant from circuits A and B shall be drained into approved refrigerant cylinders with proper labeling meeting the requirements of the EPA. It is anticipated that Seismic bracing must be removed to complete the work but will be at discretion of the contractor. Upon replacement of known leaking components to include the complete coil assembly and piping connections, contractor will then conduct thorough analysis of entire system to ensure there are no additional leaking components. At the completion of the repair and replacement of the refrigeration coil, the contractor shall clean all refrigeration piping with an approved product and dry with nitrogen to include the proper purging prior to re-charging the refrigeration circuits A and B with r-134a. All steps of clean, drying purging and charging of refrigeration circuits A and B shall be verified by the VA.. The period of performance is estimated to be approximately 120 calendar days after Notice to Proceed (NTP). The principal NAICS code for this acquisition is 236220, Commercial and Institutional Building Construction, and the FSC is Z2DA, Repair or Alteration of Hospitals and Infirmaries, Business size of $45 Million. The Solicitation will be posted on or about August 10, 2023.
Final Planning
Medical
$60,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 10, 2023
1500 N Westwood Blvd, Poplar Bluff, MO
Related To This Project
Poplar Bluff, MO
Bid Date: Sep 22 2023
Poplar Bluff, MO
Bid Date: Sep 29 2023
Poplar Bluff, MO
--
Poplar Bluff, MO
Bid Date: Oct 20 2023
Poplar Bluff, MO
Bid Date: Nov 15 2021
Poplar Bluff, MO
Bid Date: Jan 04 2022
Poplar Bluff, MO
Bid Date: Nov 03 2021
Poplar Bluff, MO
Bid Date: Jan 19 2022
Poplar Bluff, MO
Bid Date: Aug 24 2023
Poplar Bluff, MO
Bid Date: Aug 11 2023
Poplar Bluff, MO
Bid Date: Jun 29 2023
Poplar Bluff, MO
Bid Date: Jul 06 2023
Poplar Bluff, MO
Bid Date: Jul 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.