EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 21, 2023 at 8:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a transportation facility in Santa Monica, California. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

Radio Control ACLS Runway Edge Light Project. PROJECT CONTRACT DAYS (1ST AGREEMENT): 30 CALENDAR DAYS (INCLUDES ONLY 5 NIGHT CLOSURES MAX) ON-CALL CONTRACT TERM (2ND AGREEMENT): 3 YEARS WITH TWO ONE-YEAR OPTIONS LIQUIDATED DAMAGES:$1,000 per calendar day Question Deadline 08/31/2023 at 4:00 PM PT The Contractor and Subcontractors shall be licensed in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code of the State of California and submit the number and classification of said licenses with the Bid Documents. Each Bid must be accompanied by a certified or cashier's check made payable to the City of Santa Monica, or a Bidder's bond (using the form provided in the Bid Form) for an amount equal to at least ten percent (10%) of the amount bid as a guarantee that the Bidder will enter into a contract with the City. Within ten (10) Days after the issuance of the Notice of Award and prior to commencing Work on the Project, Contractor shall file with City good and sufficient Labor & Material Payment and Performance Bonds each in the amount of 100% of the Contract Sum. The City reserves the right to reject any and all Bids. Bidders will not be released on account of errors except that the City reserves the right to waive any minor irregularity or informality in any Bid.

Award

Transportation Terminals

$483,271.00

Public - City

Outdoor Lighting, Site Work

21

10

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Refrigerated Display Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting, Special Purpose Lighting, Obstruction Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Backfill

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
144
Bidding Soon
2,400
All Active Projects
1,038
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2023

October 12, 2023

img_map_placeholder

3223 Donald Douglas Loop S, Santa Monica, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Radio Control ACLS Runway Edge Light Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.