BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Chanhassen, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of November 14, 2023, project was awarded to SM Hentges & Sons Inc.,, awarded amount is $15,238,447.35** The furnishing of all labor and material for the construction of the Galpin Boulevard Reconstruction Project, major quantities for the Work include: 1 ACRE Clearing and Grubbing 93,500 C Y Excavation (Common/Subgrade/Channel and Pond) 5,500 S Y Concrete Pavement 7.0" 450 C Y Structural Concrete (1G52/3G52) 5,500 TON SP 9.5 Wearing Course Mixture (3,C) 4,800 TON SP 12.5 Non Wearing Course Mixture (3,C) 26,500 S F Prefabricated Modular Block Retaining Wall 11,000 L F 12" - 18" RC Pipe Sewer 930 L F 21" - 30" RC Pipe Sewer 3,200 L F 8" - 14" (DIP/PVC) Watermain 220 L F 16" - 24" (DIP/PVC) Watermain 800 L F Drainage Structures 31,000 L F Concrete Curb and Gutter * Together with miscellaneous removals, utility adjustments, restoration, and other related appurtenances Bid Security in the amount of five percent (5%) of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The OWNER reserves the right to retain the deposits of the three lowest bidders for a period not to exceed 60 days after the date and time set for the opening of bids. No bids may be withdrawn for a period of 60 days after the date and time set for the opening of bids. The OWNER reserves the right to reject any and all bids, to waive irregularities and informalities therein and further reserves the right to award the Contract to the best interests of the OWNER. The performance bond and payment bond shall each be in the amount of 100 percent of the contract price Completion Date: The Work will be substantially completed on or before October 31, 2024. The Work will be ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before June 24, 2025.

Award

Roads / Highways

$15,238,447.00

Public - City

Paving, Site Work

320

28

120

14

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
50
Bidding Soon
774
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2023

November 20, 2023

img_map_placeholder

Galpin Blvd, Chanhassen, MN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.