BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Reno, Nevada. Completed plans call for the renovation of a medical facility.

Contract Award Date: Dec 04, 2023 Contract Award Number: 36C26124C0030 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: XNWZFJBMRR86 Contractor Awarded Name: GLOBAL ENGINEERING SERVICES INC Contractor Awarded Address: Midvale, UT 84047 USA Base and All Options Value (Total Contract Value): $3,804,000.00 Remove and Replace Roofing - Buildings 1D & 10 Requests for Information (RFIs) / Questions regarding this TOPR shall be submitted in writing in Word format via electronic mail to dawn.graham2@va.gov by no later than Wednesday, August 30, 2023, 2:00 PM Pacific Time of construction for project 654-23-001 is between $1,000,000.00 and $2,000,000.00. 1. Contractor shall the prior to the start of construction to verify existing conditions and identify potential conflicts. 2. Contractor to remove and replace the existing roofs per the provided details and specifications. 3. Construction should be timed to be performed in late spring and summer. 4. Contractor shall coordinate with VA staff to minimize disruptions to normal operations. 5. Contractor shall coordinate staging, access, and crane for both buildings with COR. Building 1D will take additional coordination for staging a crane as it's bound by building 5 to the south, building 4 to the west, and buildings 1 and 12 to the east. The existing Emergency Department entrance shall not be impeded. Scaffolding may be necessary where there is no roof access thru the building. 6. Access to building 10 to be by contractor supplied OSHA compliant ladders and coordinated with COR. 7. All existing ballast, pavers, single ply roof system, insulation, protection board to be removed to substrate and disposed of properly. 8. Contractor to perform lead and asbestos sampling on roofing materials to be demolished to confirm if there are hazardous materials present. 9. Given the age of some of the existing structures it is likely that the contractor will need to perform asbestos abatement, lead paint elimination, PCB removal and other similar remediation efforts will be necessary at some, if not all, of the structures to be demolished as part of this project. 10. Contractor to provide temporary weather protection during inclement weather conditions. 11. Equipment moving to accommodate tear off and re-setting on new roof. 12. Contractor to remove all roof drain covers and provide blow down of drainpipes to ensure no blockages, install new roof drain assembly, and ensure roof slopes to drains. 13. Existing lightning protection conductors located on the building roof and parapet shall be removed. 14. Building 1D:14.1. Existing equipment stands no longer in use, solar array, and solar array equipment enclosure including: all equipment, enclosure, stand conductors, mounting brackets, hardware, and conduit to be removed and disposed of properly. 14.2. Install new flashing where roof system terminates at wall, at curb mounted equipment, at vents through roof, and at raised equipment support. 15. Building 10: 15.1. Remove and property dispose of existing equipment not in use. 15.2. Install new flashing where roof system terminates at wall, at curb mounted equipment, at parapet wall, at vents through roof, at raised equipment support, as necessary at existing exhaust fans, and at base of duct work supports per roof manufacturers system. 15.3. Install high visibility safety demarcation line (nighttime reflective) to establish a 3- foot safety inset line. 16. Install new single ply TPO roof system, new rigid insulation, and use tapered insulation to obtain proper slope per specifications. 17. Work is to be performed during normal work hours Monday - Friday between the hours of 7:30am and 4pm, excluding Federal holidays. After hours work may be required during work phases that generate high levels of noise/vibrations or produce noxious fumes that cannot be contained to the work area. The proposed work shall be performed to cause minimal disruption to staff and patients. 18. Crane lifts shall be performed before or after-hours Monday - Friday or on weekends when buildings are unoccupied. Any after-hours work will be agreed upon with the Contracting Officer's Representative (COR) prior to the work commencing. 19. COR Notification: No contractor is permitted to perform on- contract work without COR knowledge. 20. Work area shall be cleaned prior to leaving the . Any hazards shall be identified, and risk properly mitigated to allow normal access through the corridor during regular hours. 21. Any damage from the work of this project shall be repaired to its former condition at contractor's expense. 22. Contractor is responsible for all permits and fees required by the City of Reno, and or State or local authorities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Medical

$3,804,000.00

Public - Federal

Renovation

14

18

41

2

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
15
Bidding Soon
211
All Active Projects
87
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

December 4, 2023

img_map_placeholder

975 Kirman Ave, Reno, NV

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.