EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 10, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Suffern, New York. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000327200 Replacement of curbs and ADA ramps. The project consists of the replacement of curbs and ADA ramps. All work must be completed by November 1, 2023 Question Acceptance Deadline 08/25/2023 04:00 PM EDT Questions are submitted online Yes Bids shall be made on the Proposal Forms furnished with the Contract Documents and must be accompanied by a Bid Bond acceptable to the Village of Suffern, or a certified cashier's check drawn on a solvent bank in the amount of not less than 5% of the total amount of the Bid. Checks shall be made payable to the Village of Suffern, New York, and are to be held by the Village as a guarantee for the proper execution and delivery of the Contract and Letter of Credit to secure the faithful performance thereof. In default of such execution and delivery of Contract and Letter of Credit with the above requirements within ten (10) days after the proposal shall have been accepted, the amount of the deposit represented by the check or bid bond shall be forfeited to and retained by the Village of Suffern as liquidated damages. Scheduled to commence during the month of September 2023. The final completion of this project must be prior to the Roadway Improvements Phase 13 Project (milling and resurfacing) to be completed by October 9, 2023. The successful bidder must closely coordinate and schedule all work activities. Maintenance Bond is required in the amount of at least equal to the contract price and for a duration of one (1) year from the date of final acceptance. Maintenance Bond is to cover all defective conditions arising by reason of defective materials, work or labor performed by the Contractor.

Under Construction

Sidewalks / Parking Lot

$55,425.00

Public - City

Paving, Site Work

3

10

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
539
Active Projects
296
Bidding Soon
4,931
All Active Projects
2,271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

September 29, 2023

img_map_placeholder

Multiple Locations, Suffern, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Right of Way Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.