BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Camp Murray, Washington. Completed plans call for site work for a municipal facility.

ESTIMATED BID COST RANGE: $424,164 to $487,696 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidders are required to complete a preregistration form prior to accessing Camp Murray.Once completed, bidders shall notify Atika Jain (KMB architects) and Brad Olson (WMD) via email that the form has been filled out. A printout of the completed form shall be provided for the registration process at the gate. Submit questions and clarifications regarding Drawings and Specifications no later than 5:00 pm, Friday, 1 September 2023. If necessary, a final Addendum will be issued on Monday, 4 September 2023. The Project consists of replacement of 61 existing fiberglass flagpoles with aluminum flagpoles. Work includes complete demolition of existing concrete footings fill, grounding spike, and other related existing footing material and construction of new concrete footings, fill, grounding spike, and aluminum flagpoles . Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. The State reserves the right to accept or reject any or all bids and to waive informalities. Contingent upon receipt of Federal funds.

Bid Results

Municipal

$267,685.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
77
Bidding Soon
1,969
All Active Projects
574
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 6, 2023

October 6, 2023

img_map_placeholder

Multiple Locations, Camp Murray, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.