BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Walla Walla, Washington. Contact the soliciting agency for additional information.

Contract Award Date: Oct 06, 2023 Contract Award Number: 36C26024P0028 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: MN4TJ2WKHEN5 Contractor Awarded Name: INLAND POTABLE SERVICES, INC. Contractor Awarded Address: Centennial, CO 80015 USA Base and All Options Value (Total Contract Value): $3,150.00 Walla Walla VAMC Requires Water Tower Inspection and Cleaning. IAW the SOW. See Section E.1 for quote preparation. Please provide SAM UEI number when submitting a quote Provide responses to adam.hill3@va.gov. Background The Walla Walla Veterans Administration Medical Center (WWVAMC) installed a 150,000- gallon, Elevated Storage Tank October of 2015. The system components associated with this work are: two wells, pumphouses that have a hypochlorite system and the water tower. The two wells on the facility chemically treat the water before being pumped to the tank. This system is the primary source for potable water consumption, water pressure and fire protection throughout its 88-acre property. The WWVAMC facility is also tied into the city of Walla Walla water as a backup The Elevated Storage Tank must be inspected and cleaned on a regular basis to meet all Environmental Protection Agency(EPA), Washington State Department of the Health(WSDH), Occupational Safety Health Administration(OSHA) and National Fire Protection Agency(NFPA) requirements. Place of Performance All work under this contract is to be performed at the following locations: A. Walla Walla VA Medical Center, 77 Wainwright Dr, Walla Walla, WA 99362 B. The contractor's water analysis lab (if required) or the lab the contractor specifies Period of Performance Upon award of contract, contractor must be capable to perform a full inspection, cleaning and water analysis within 15 days. Any work that will cause the water tank to be unusable fully or partially for the WWVAMC must be scheduled and approved by the facility. Efforts will be taken by the WWVAMC to perform work outside the normal business hours if the water tower is to be taken out of service for any period of time. Per AWWA C652-11, the water tanks shall be inspected at a frequency of no greater than once every 5 years. The WWVAMC shall have their tank inspected and cleaned once every 3 years.

Award

Water / Sewer

$3,150.00

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
123
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2023

October 30, 2023

img_map_placeholder

77 Wainwright Dr, Walla Walla, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.