Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Greenville, Kentucky. Completed plans call for site work for a water / sewer project; water / sewer project; and water / sewer project.
The Wendell H. Ford Regional Training Center (WHFRTC) is on reclaimed strip-mine land. Cypress Creek is channelized and flows in a straight pattern through broad floodplains within the WHFRTC, resulting in the loss of diverse aquatic habitat complexes. The project will involve the relocation and restoration of +/- 49,770 linear feet of Cypress Creek and its tributaries using natural channel design principles. The objective of this project is to establish a stable, natural stream pattern and dimension to restore the existing degraded habitat, altered primary physical processes, and destabilized in-stream conditions. Because of the size and scope of the project, construction will be accomplished in eight (8) phases following a logical sequence of work (see Exhibit 1, Page 2). This bid package is for Phase 1 of the project involving the restoration of ~6,780 linear feet of stream. The bid will include a main bid and two additive alternates. The main bid consists of 5,280 linear feet of stream restoration on Cypress Creek (STA 0+00 – 52+80). Work will include, but is not limited to, excavation of proposed channels and floodplains; construction of in-stream structures and bank treatments; reshaping of existing channels; preparation of seedbeds; installation of erosion control blanket and mulch; and installation of native seeds, trees, shrubs, and live stakes. Grading and shaping may also occur within the floodplains adjacent to project streams to facilitate the storage and/or transport of floodwaters. Additive alternate #1 will include ~667 linear feet of stream restoration on Cypress Creek (STA 52+05 – 58+72). Work will include, but is not limited to, excavation of proposed channels and floodplains; construction of in-stream structures and bank treatments; reshaping of existing channels; preparation of seedbeds; installation of erosion control blanket and mulch; culvert replacement; and installation of native seeds, trees, shrubs, and live stakes. Grading and shaping may also occur within the floodplains adjacent to project streams to facilitate the storage and/or transport of floodwaters. Minor tie-in of existing tributaries 1-8 and 1-9 will be required if Add Alternate 2 is not performed. Additive alternate #2 will include ~830 linear feet of stream restoration on tributaries to Cypress Creek (Tributaries 1-8 and 1-9). Work will include, but is not limited to, excavation of proposed channels and floodplains; construction of in-stream structures and bank treatments; reshaping of existing channels; preparation of seedbeds; installation of erosion control blanket and mulch; culvert replacement; and installation of native seeds, trees, shrubs, and live stakes. Grading and shaping may also occur within the floodplains adjacent to project streams to facilitate the storage and/or transport of floodwaters.
Bid Results
Water / Sewer
$1,240,800.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2023
October 15, 2023
St-1000-10, Greenville, Greenville, KY
Related To This Project
Greenville, KY
Bid Date: Oct 05 2023
Greenville, KY
Bid Date: Sep 20 2023
Greenville, KY
Bid Date: Nov 23 2021
Greenville, KY
Bid Date: Oct 22 2021
Greenville, KY
Bid Date: Sep 22 2023
Greenville, KY
Bid Date: Mar 24 2022
Greenville, KY
Bid Date: Oct 27 2023
Greenville, KY
Bid Date: Jun 30 2023
Greenville, KY
Bid Date: Jun 22 2023
Greenville, KY
Bid Date: May 30 2023
Greenville, KY
Bid Date: Jul 12 2023
Greenville, KY
Bid Date: Mar 31 2023
Greenville, KY
Bid Date: Apr 14 2023
Greenville, KY
Bid Date: Mar 11 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.