BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Tacoma, Washington. Contact the soliciting agency for additional information.

Services to be provided include but may not be limited to: 1. Assess existing data for usability and conformance with acceptance criteria for future use on the project. Manage and store historical (and future) data electronically using an environmental database management system (EDMS). The EDMS should provide an efficient way to manage, filter, query and retrieve all project related data. 2. Prepare a Conceptual Site Model (CSM) to help visualized and understand available site information and support project planning and decision making for the Site. 3. Use the updated project database and CSM (items no. 1 and 2) to identify data gaps to be filled during the supplemental RI field activities. 4. Preparation of a Supplemental Remedial investigation Work Plan. 5. Execute of the Supplemental Remedial investigation Work Plan 6. Preparation of a Supplemental Remedial investigation Report. 7. Preparation of a Feasibility Study. 8. Preparation of a Draft Cleanup Action Plan. 9. SEPA support. 10.Facilitate and/or support agency meetings, negotiations, and public participation support. 11.Provide environmental and engineering services support for interim action cleanup implementation including but not limited to survey, coastal engineering, dewatering, shoring, civil engineering, preliminary engineering and final design including plans, specs and estimate 12.Provide environmental and engineering services support for cleanup implementation including but not limited to survey, coastal engineering, dewatering, shoring, civil engineering, preliminary engineering and final design including plans, specs and estimate. 13.Provide environmental and any necessary site development permitting services including aquatic and upland permits focusing on federal Section 404, Section 10 and ESA Section 7 compliance and any state and local permits that may fall outside of the MTCA process. 14.Other services as requested or required. Last Day to Submit Questions AUGUST 24, 2023 @ 2:00 PM (PST)

Conceptual

Municipal

$300,000.00

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
26
Bidding Soon
671
All Active Projects
286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2024

img_map_placeholder

401 Alexander Ave, Tacoma, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.