BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a museum in Triangle, Virginia. Completed plans call for the renovation of a museum.

Contract Award Date: Sep 01, 2023 Contract Award Number: M00264-23-P-0120 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: LP6VEG54K3L6 Contractor Awarded Name: EXPLUS INC Contractor Awarded Address: Sterling, VA 20166 USA Base and All Options Value (Total Contract Value): $95,212.00 2.0 : This requirement is for fabrication and installation of a semi-circular platform approximately 22 feet in diameter with an integral handrail and rubber floor covering. The railing shall have two (2) built-in holders for paper graphics that will be generated by NMMC. To facilitate installation of artifacts, one section of the railing will pivot out of the way and a removable ramp will be provided to roll the vehicle up onto the display. The display will be custom fabricated of steel (or approved alternative) and painted to match the existing gallery color. See attached drawings for more information. The Vendor's responsibilities include: o Fabrication of the display to meet the design intent o of field survey to verify conditions and dimensions o Modification of existing railing to accommodate new design o Creation of fabrication drawings for approval by NMMC o Sample submission of paint and floor covering o Installation of the display 2.1. Place of : NMMC is located within Prince William County and subject to concurrent jurisdiction with Marine Corps Base (MCB), Quantico, VA 22134 address: The National Museum of the Marine Corps (NMMC) 1775 Semper Fidelis Way, Triangle, VA 22172-1949 2.2. Period of : All work to be fully complete in accordance with the terms of the PWS by April 01, 2024. Vendor Questions: Vendor questions should be submitted via email to Molly Henderson, Contract Specialist, at molly.henderson@usmc.mil, no later than 2:00 PM Eastern Time on Thursday, August 17, 2023. Any resultant amendment from Q&A will be posted with all Q&As. REQUIRED DELIVERY/PERIOD OF . shall begin on September 25, 2023. All work to be fully complete in accordance with the terms of the PWS, no later than April 01, 2024. M304003367960

Award

Museum

$95,212.00

Public - Federal

Renovation

9

3

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
167
Bidding Soon
3,308
All Active Projects
1,345
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 28, 2023

September 25, 2023

img_map_placeholder

1775 Semper Fidelis Wy, Triangle, VA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.