Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in Goldsboro, North Carolina. Completed plans call for the renovation of a military facility.
SCOPE: The work covered by the provisions of this Agreement consists of furnishing all labor, tools, equipment, and transportation necessary to install chilled water pipe insulation on Heating, Ventilation and Air Conditioning (HVAC) systems and/or their components and subcomponents for a specified location. Coordinate installation/repair time with authorized Government personnel. Collect materials from the authorized Government representative. Complete the job in accordance with all federal, state, and local codes. Prove functional operations prior to payment. Installation services include, but are not limited to: Install chilled water line insulation over/around valves, actuators, pipes, fittings, sensors, heat tape, and other related components. QUALIFICATIONS: The contractor shall be a trained HVAC Insulation contractor licensed in the state of North Carolina. Workers shall have the HVAC knowledge equivalent to at least the journeyman level of workmanship. MATERIALS: The contractor will be responsible for providing a list of all materials for quoted job to 4 CES, 4 CES will procure the materials. The material will consist of fiberglass insulation with smooth aluminum jacket for the outdoor installation, and fiberglass insulation with plastic jacket indoors. Hydronic piping shall be insulated to a minimum thickness as required by ANSI/ASHRAE/IESNA Standard 90.1, UFC 3-430-01, and UFC 3-430-09. See pictures below for an example. LOCATION: Work to be accomplished is at the specific building HVAC system on Seymour Johnson Air Force Base, Goldsboro, NC or Blakeslee Rec Area at Kure Beach, NC SECURITY: Work areas involving Secret and Top Secret items will have a Government representative present at all times. WORK WEEK: The contractor will be required to work during normal duty hours, 0700-1600, Monday-Friday. After hours work can be approved by a Government representative. WORKMANSHIP: All workmanship shall comply with Unified Facilities Criteria (UFC), ANSI/ASHRAE/IESNA Standards. The contractor shall provide all qualified personnel, equipment, and services required to install or repair HVAC systems. CLEAN UP: The contractor is responsible to return all work sites back to their original condition when finished with their project. TIME OF PERFORMANCE: The contractor will be shown the job site and informed of the requirements. The contractor shall be available to begin work within two (2) days from order award. The Government will not pay for travel time to and from the jobsite. WARRANTY: The contractor will guarantee all workmanship for a period of one year from completion of work. The contractor will be responsible for any damage to Government facilities resulting from their work. If damages are incurred, the contractor will supply skilled craftsmen and materials to make repairs.
Post-Bid
Military
$100,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2023
September 14, 2023
Multiple Locations, Goldsboro, NC
Related To This Project
Goldsboro, NC
Bid Date: Dec 14 2021
Goldsboro, NC
Bid Date: Dec 21 2021
Goldsboro, NC
--
Goldsboro, NC
Bid Date: Feb 18 2022
Goldsboro, NC
--
Goldsboro, NC
Bid Date: Mar 23 2021
Goldsboro, NC
Bid Date: Jul 25 2019
Goldsboro, NC
Bid Date: Apr 12 2022
Goldsboro, NC
Bid Date: Sep 19 2023
Goldsboro, NC
Bid Date: Aug 31 2023
Goldsboro, NC
Bid Date: Aug 08 2023
Goldsboro, NC
Bid Date: Aug 09 2023
Goldsboro, NC
--
Goldsboro, NC
Bid Date: Mar 14 2019
Goldsboro, NC
Bid Date: Feb 12 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.