BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Berkley, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

All work under this Contract shall be done in conformance with the 2023 Standard Specifications for Highways and Bridges, the Supplemental Specifications contained in this book, the 2017 Construction Standard Details, the Traffic Management Plans and Detail Drawings, MassDOT Work Zone Safety Temporary Traffic Control, the 1990 Standard Drawings for Signs and Supports; the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Massachusetts Amendments; the 1968 Standard Drawings for Traffic Signals and Highway Lighting; The American Standard for Nursery Stock; the Plans and these Special Provisions. The work to be performed under this contract consists of pedestrian curb ramp construction, reconstruction, repairs and upgrades at locations indicated in the following special provisions section (Location of Work), Contract Plans, and as required by the Engineer. Work shall include, but not be limited to: construction or reconstruction of cement concrete pedestrian curb ramps, construction or reconstruction of cement concrete and hot mix asphalt sidewalks and driveways, minor drainage alterations as needed, removing and resetting of curb and transition curb as required, and repairing of roadway cuts required to perform work. The work also consists of modifications to existing traffic signals and installation of Rectangular Rapid Flashing Beacons. The Contractor shall prepare an appropriate Pedestrian Management Plan and Traffic Management Plan, for each location, in compliance with current MassDOT and ADA guidelines, subject to approval of the Engineer. All work shall be within the tolerances established in the Construction Standard Details. All work done under this contract shall be performed from the roadway shoulder to the maximum extent practical. Location: District 14 District: 4 Project Number: 609387 Project Type: Highway - Construction MADOT - Ada Retrofits at Various Locations

Award

Sidewalks / Parking Lot

$2,787,989.00

Public - State/Provincial

Paving, Site Work

4

7

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
501
Active Projects
203
Bidding Soon
3,696
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2023

November 27, 2023

Project location map

Multiple Locations, Berkley, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.