EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 20, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Victorville, California. Completed plans call for the renovation of a water / sewer project.

As of November 22, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. SCOPE OF WORK: Contractor shall provide all supervision, labor, equipment, materials, transportation, and all appurtenances necessary to complete the Project that includes in its entirety the renovation of the Lakeview Lift Station as outlined in the project construction plans and technical specifications. Work includes but is not limited to upgrading the existing sewer lift station to selective site demolition, hauling, off-site legal disposal, erosion control, sewer bypass, ongoing project odor control, pump, piping, and electrical equipment installation, start-up and commissioning, traffic control and all other work as indicated on the construction drawings and as specified herein and as necessary to complete the project in its entirety. All bidders must register with the ePro system prior to the date and time to receive sealed bids or they will be disqualified. Late or incomplete bids will be considered nonresponsive. A "complete" bid is defined as a bidder's submittal that includes all bid documents (i.e., the bid / proposal, bidder's security in a separately sealed envelope, and any other bid documents required for the project). System-related issues in ePro shall be directed to Vendor support at ePro.Vendors@buyspeed.com or at (855) 800-5046. For procurement questions involving ePro, please contact the Purchasing Department at (909) 387.2060. BIDS SUBMITTED BY FIRMS NOT ATTENDING THE MANDATORY PRE-BID MEETING WILL BE REJECTED AS NONRESPONSIVE. Each bidder shall be a licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following classification of contractor's license, for the work bid upon, and must maintain the license throughout the duration of the contract: California Class "A" Contractor's License. In order to be deemed responsive, the bidder must list, in the bid forms, at least three (3) projects of similar size and scope that it has completed over the last five years. A copy of these rates shall be posted by the successful bidder at the job site. Bids must be accompanied by cash, a certified or cashier's check, or bidder's bond executed by an admitted surety insurer, made payable to the District in an amount not less than ten percent (10%) of the submitted total bid price given as a guarantee that the bidder will enter into a contract. The successful bidder will be required to furnish the District with a Performance Bond and a Payment Bond, each equal to 100% of the successful bid, prior to execution of the contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120 and is admitted by the State of California. Pursuant to Public Contract Code Section 22300, the successful bidder may substitute certain securities for funds withheld by the District to ensure its performance under the Contract. The District shall award the Contract for the Project to the lowest responsible bidder as determined from the base bid by the District. The District reserves the right to reject any or all bids, to waive technical errors, discrepancies or informalities of a bid not affected by law, if to do so seems to best serve the public interest. For information contact Lupe Camacho at (909) 386-8801 office or (909)266-6246 mobile or email (lupe.camacho@sdd.sbcounty.gov). By order of the Governing Board for the District at San Bernardino, California. The work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation and services, including fuel, power, water, and essential communications, and performing all work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The work shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper construction of the work in good faith shall be provided by the Contractor as though originally so indicated, at no increase in cost to the District. The work generally includes, but is not limited to, furnishing all products, labor, equipment, material, transportation, and incidental services to construct the following: 1. Upgrade the existing sewer lift station including, but not limited to selective site demolition, hauling, off-site legal disposal, erosion control, coordination, assistance, collaboration and appurtenances necessary for the Contractor to establish the temporary sewer bypass, pumps, piping, and electrical equipment installation, start-up and commissioning, traffic control and all other work as indicated on the construction drawings and as specified herein and as necessary to complete the project in its entirety. 2. Groundwater may be encountered in excavations. The cost of dewatering, water control and legal disposal, permitting, treatment, additional shoring, and all other related work, will be paid for at the unit price as shown in the bid items. 3. All excavations may encounter varying soil and excavation conditions. All types of condition including rock removal and shoring due to unstable slopes, will be considered as part of the various items of work and no further compensation shall be made. Question Deadline Aug 31, 2023 Online Q/A *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$1,187,964.00

Public - County

Renovation

28

35

6

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Transfer Switches, Automatic Transfer Switches, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Trenching, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Specialty Material Handling Equipment, Lubrication Systems
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
128
Bidding Soon
2,198
All Active Projects
965
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2023

October 9, 2023

img_map_placeholder

18332 Lakeview Dr, Victorville, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lakeview Lift Station Renovation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.