BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 8, 2023 at 7:00 PM

Updated November 15, 2023

Site work and asbestos abatement for a mixed-use development in Tyngsborough, Massachusetts. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Work under this contract shall include furnishing all labor, equipment and material required for asbestos and hazardous material abatement in the former school building located at 250 Middlesex Road in Tyngsborough consisting of a partially finished basement and first floor totaling 17,570 square feet uestions concerning this IFB must be submitted in writing to Assistant Town Manager Katharine Foster by email to kfoster@tyngsbrooughma.gov or by mail to 25 Bryant Lane Tyngsborough MA 01879. A Winslow School Asbestos Abatement Project 250 Middlesex Road, Tyngsborough MA 01879 Questions concerning this IFB must be submitted in writing to Assistant Town Manager Katharine Foster by email to kfoster@tyngsbrooughma.gov or by mail to 25 Bryant Lane Tyngsborough MA 01879. All questions must be received by Friday, October 13, 2023 at 4:00 PM. Any question received after that deadline may not be answered.

Award

Educational

$149,125.00

Public - City

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
592
Active Projects
278
Bidding Soon
4,554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2023

November 17, 2023

Project location map

250 Middlesex Rd, Tyngsborough, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.