BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2023 at 8:00 PM

Updated January 26, 2024

Demolition and site work for a pre-engineered storage facility in Shelbyville, Tennessee. Completed plans call for the demolition of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Overview: Removal of three (3) metal buildings located at H. V. Griffin Park, 220 Tulip Tree Road, Shelbyville, TN. Demolition to include removal and disposal of all materials per EPA regulations leaving only the concrete slabs. Option: removal and disposal of all concrete slabs If you have any questions regarding this solicitation, please contact Lori Saddler at lori.saddler@shelbyvilletn.org.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$37,600.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
0
Bidding Soon
862
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2023

September 27, 2023

Project location map

To Be Determined, Shelbyville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.