BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 28, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a pipeline in Jericho, Vermont. Completed plans call for site work for a pipeline.

This project will consist of, but not be limited to, (Converting most building at Ethan Allen Firing Range (EAFR) from propane to VT Gas and replacing 2 boilers and 2 furnaces) labor and material to Install piping from VT Gas Meters outside buildings to all utilities inside buildings, converting boilers and furnaces to natural gas, and replacing 2 boilers and 2 furnaces as indicated on the drawings and specs by CEA, dated July 2023. Questions may be submitted until August 25,2023 at 12:00pm. Questions should be submitted by email to the project manager and the architect.

Post-Bid

Pipeline

$250,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
355
Active Projects
200
Bidding Soon
2,165
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2023

October 6, 2023

Project location map

113 Ethan Allen Rd, Jericho, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.