BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2023 at 8:00 PM

Updated January 27, 2024

Renovation of a water / sewer project in Fenton, Michigan. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000327618 The City of Fenton is seeking bids to replace two HVAC RTU units at the Fenton Water Treatment Plant. See attached bid document for full project description. Delivery Point 15300 North Road Fenton MI 48430 Question Acceptance Deadline 08/30/2023 03:00 PM EDT Questions are submitted online No Questions regarding the bid documents, work scope or project worksite can be directed to Dan Brisson, Public Works Director via email dbrisson@cityoffenton.org or phone 810-629-2261. *The City reserves the right to reject any or all bids, in part or in their entirety, or to waive any informality or defect in any bid, or to accept any bid which, in its opinion is deemed most advantageous to the City. 1. Furnish and install one (1) RTU unit, Rheem Model # RGECZR060ADU12BACAE1, Identified as RTU-1, Office Area. See attachment A for additional information 2. Furnish and install one (1) RTU unit, Rheem Model # RGECZR060ADU12BCCNE1, Identified as RTU-2, Laboratory. See attachment A for additional information. 3. Furnish and install one (1) Rheem RHC-ZNS4 Humidity Sensor for RTU-2 unit. See attachment A for additional information. 4. Furnish and install two programmable (7 day/1 event) thermostats. Existing "Nest" thermostats to be returned to the city. 5. Environmentally reclaim existing unit's refrigerant and properly dispose of. 6. Disconnect, remove and properly dispose ofthe two existing RTU units. 7. Provide all associated rigging to remove existing RTU units and install new units on the roof. 8. Perform any curb/foundation repairs or updates in preparation ofthe new RTU Units. Note the city plans to rehabilitate the roofwith a new rubber membrane layer in the near future. 9. Furnish and install new pads, whips and disconnects if needed to meet current electrical standards. 10. Furnish and install all necessary electrical equipment, conduit, wiring for equipment. 11. Furnish and install all necessary gas parts, fittings, materials for connection to new equipment. 12. Provide start-up of all equipment and verify proper operation, where system is a turn-key solution

Award

Water / Sewer

$24,485.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
214
Bidding Soon
2,284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2023

October 5, 2023

Project location map

15300 North Rd, Fenton, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.