BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Knoxville, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

If any Contract Documents are not sufficiently clear to permit Contractor to proceed with the work, Division or Engineer shall, either upon their own initiative or upon the request of Contractor, furnish additional written instructions, together with additional drawings as may be necessary. Requests by Contractor must be made sufficiently far in advance to permit preparation of instructions and drawings by Engineer before commencement of the work. For purposes of avoiding delays in the preparation of any additional instructions and drawings, Engineer and Contractor shall jointly prepare a schedule showing the time for commencement of the work to be included in them and the time by which Contractor shall furnish the shop drawings necessary for their preparation. No work shall be performed by Contractor without proper drawings or instructions. Contractor shall at Contractor's expense, replace any wrongly executed work. This project is the reclamation of the Johnson AML site in Marion County, Iowa. In general, the workincludes, but isnotlimited to impoundment discharge, clearing, grubbing, excavation, channel construction, pipe installation, sediment anderosion control, and permanent seeding. Bid quantities include but are not limited to 9.8 acres of clearingandsitepreparation, 93,600 cubic yards of excavation, 47 tons of Class E riprap, 336 lineal feet of channel construction, 840squarefeet of tied block mat, and 9.6 acres of permanent upland seeding. A complete list of bid items is providedwiththeplans. Questions concerning the Plans and Construction Specifications should be addressed to Wallace Greenlees, P.E., 515-281-5643. All other questions concerning other Contract Documents should be addressed to Angie Sebastian, ProjectCoordinator, 515-822-1538. In order to be considered in a final addendum, written questions must be receivednolaterthanAugust 22, 2023. This project shall comply with Davis-Bacon Wage Requirements The anticipated cost of construction to reclaim the site is expected to range from$320,000 to $395,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$304,524.00

Public - State/Provincial

Paving, Site Work

19

11

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
34
Bidding Soon
516
All Active Projects
192
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

September 25, 2023

img_map_placeholder

Multiple Locations, Knoxville, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.