BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Jeffersonville, Indiana. Completed plans call for the renovation of a multi-residential development.

Owner: The Jeffersonville Housing Authority Jeffersonville, Indiana The Pre-bid Conference is for the Purpose of Permitting Bidders and Their Subcontractors to Thoroughly Inspect the Areas of the Proposed Work and to Request Clarifications or Interpretations of Contractor's Questions. Any Responses to Material Concerns Shall Be as Issued in an Addendum to the Contract Documents. 1.3 Bids Will Be Received From Contractors for Work as Shown on the Drawings and Hereinafter Specified and as Set Forth on the Contractor's Bid Form. Contractors Must Provide a Price for the Alternate Bids and Unit Prices Within the Bid Package. 1.4 Bids Will Be Opened Publicly and Prices Read Aloud at the Bid Opening, With a Bid Tabulation Sheet Issued at a Later Date. 1.5 Contractors Shall Submit Complete Bid Sets in Triplicate, Including One (1) Original and Two (2) Copies of All Submitted Documents. Failure to Do So May Render the Proposal Incomplete or Unresponsive. 1.6 Copies of the Plans, Specifications, Addenda and Other Proposed Contract Documents Are on File and Open to Public Inspection at the Following Locations During Regular Office Hours by Appointment: Lynn Imaging, Blueprint and Supply Co. 11460 Bluegrass Pkwy Louisville, Ky 40299 Telephone: (502) 499-8400 Jeffersonville Housing Authority 206 Eastern Boulevard Jeffersonville, Indiana 47130 Telephone: (812) 283-3553 Contractors May Preview the Bid Documents During Regular Business Hours at the Housing Authority's Administration Building, by Making an Appointment. Appointment Shall Be Made in Advance With the Housing Authority's Executive Director Mr. Darnell Jackson, at Office Phone Number (812) 283-3553. Partial Bid Document Sheets and/or Drawings May Be Posted on the Housing Authority's Web Site, as Listed Above. A. All Contractors Considering Submitting a Bid Should Verify With the Reprographic Printing Company Listed Above, the Total Number of Addenda Issued on a Project the Day Before the Proposal Due Date. Failure to Do So May Render the Proposal Incomplete or Unresponsive. 1.8 the Work for Which Bids Are Requested Includes All Bonds, Insurance, Labor, Materials, Equipment, and Items of Materials and Services Required to Provide the Proper and Complete Construction of This Project. The Work Shall Be Constructed in Accordance With This Advertisement for Bids, Drawings and Project Manual as Prepared for This Project by Edward Revers of Revers Architecture and Design, Ncarb Certified, Licensed to Practice Architecture in the State of Indiana. (Erevers17@gmail.com / Phone 502-379-7317). 1.9 Bids and Bid Guarantees Shall Be Placed in Sealed Envelopes and Addressed to: Mr. Darnell Jackson, Executive Director Jeffersonville Housing Authority 206 Eastern Blvd. Jeffersonville, Indiana 47130 1.10 Bids Shall Be Executed on Indiana State Board of Accounts Form #96 (2013 Edition) With Non-collusion Affidavit, Sworn to as Required by the Statutes of Indiana. All Other Data Required by Bid Form 96, Part Ii and Part Iii Must Be Submitted as Required by Bid Form No. 96 Without Regard to the Total Bid Amount. 1.11 Each Individual Bid Package Proposal Shall Be Accompanied by a Certified Check or Bank Draft, Payable to the Jeffersonville Housing Authority, Jeffersonville Indiana. U.s. Government Bonds, or a Satisfactory Bid Bond Executed by the Bidder of an Acceptable Surety In an Amount Equal to Five Percent (5%) of the Base Bid Plus All Add Alternates. 1.12 Sealed Envelope Shall List the Name and Address of the Proposal Bidder on the Exterior of the Envelope. 1.13 the Successful Bidder Shall Be Required to Provide a 100% Performance Bond and Labor and Material Payment Bond Before Starting Any Work or Placing Materials on the Job. The Bonds Shall Be Received Within Ten (10) Days of Receipt of Notice to Proceed. 1.14 All Prices Bid, Are to Be Free of All Indiana State Sales Tax, and Upon Request of Supplier, a Tax Exemption Certificate Will Be Executed by the Owner to the Successful Bidder to Cover All Items Subject to This Tax. 1.15 Attention is Called to the Provisions for Equal Employment Opportunity, And Payment of Not Less Than the Minimum Davis Bacon Wage Rates And Salaries Must Be Paid on This Project, as Set Forth in the Project Manual. 1.16 Attention is Called to the Fact That the Contractor Must Take Affirmative Action to Insure That Applicants Are Employed, and That Employees Are Treated During Employment, Without Regard to Their Race, Color, Religion, Sex or National Origin. 1.17 Contractors Are Required to Comply With the Provisions of Section 3 as Set Forth on 24 Part Cfr B5 as Follows: A. A Good Faith Effort to Utilize Section 3 Area Residents as Trainees And Employees. B. A Good Faith Effort to Award Contracts for Work in Connection With the Project on Section 3 Business Concerns. 1.18 Attention is Called to a Request That the Contractor Shall Make a Best Efforts Goal to Achieve a State Goal of 10% Minority and/or Women Owned Business Enterprise Participation in This Project. 1.19 Bidders Are Required to Submit the Following Documentation, in Triplicate, With Each Individual Bid Package Submittal: 1. Contractor's Bid for Public Works, State Form 96, as Prescribed by The State Board of Accounts of Indiana, Complete With Parts I - Iii. These Completed Forms Are a Required and Mandatory Document for This Project, Regardless of the Actual Bid Amount Total. 2. Hud Form 5369a, Representatives Certification and Other Statement of Bidders. 3. Hud Form 2530, Previous Participation Certificate. 4. Hud Form 5370, Contractor's Insurance Certificates With Coverage And Limits as Stated in the General Conditions. 5. Stated Acknowledgement of All Addenda Issued on the Project. (Space Provided on the Bid Forms) 6. Contractor's Financial Statement (Mandatory, as Required in Part Ii Section Iii of State Form 96) 7. Contractor's Bid Guarantee: Bid Bond, Certified Check, or Bank Draft. 1.20 Bids May Be Held by the Jeffersonville Housing Authority for a Period Not to Exceed Forty Five (45) Calendar Days From the Date of the Opening of Bids for the Purpose of Reviewing the Bids and Investigating The Qualifications of Bidders Prior to Awarding the Contract. Bidders Shall State in Hud Form 5369a, Article 6(D) if a Longer Acceptance Period is Offered. 1.21 the Jeffersonville Housing Authority Reserves the Right to Reject Any or All Bids or to Waive Any Informalities in the Proposal Solicitation Process, to the Extent Allowable by Law.

Award

Multi-Residential

$262,276.00

Public - City

Renovation

17

14

2

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
107
Bidding Soon
1,665
All Active Projects
802
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 12, 2023

October 12, 2023

January 3, 2024

img_map_placeholder

206 Eastern Blvd, Jeffersonville, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.