BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a fire / police facility in Rocklin, California. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

The selected firm will provide construction drawings and project management through the completion of construction. This will require regular meetings with City staff and the construction team. The construction team will be selected through a closed bid process, but the selected architectural firm will be expected to participate in the bid process by being available to respond to questions from bidders Qualified firms for professional Architectural and Engineering Services for the design and construction of a new fire station The City will be constructing a fourth fire station off of Sierra College Boulevard and Stadium Way. The station will be located in the College District and expected to adhere to the architectural standards of the design district. This station will be constructed on an approximately 2-acre parcel directly adjacent to Sierra Community College, and will provide coverage for east Rocklin (see section 4.3 Proposed Site Location). Project elements will be finalized through the design process; however, it is anticipated that Station 22 at a minimum should include: o Three (3) Pull Through Apparatus Bays o Dorm Rooms for Four (4) Fire Personnel with restroom and showers o A common or day area with a kitchen o Office space o Fitness room o Turnout Storage Room o Self-Contained Breathing Apparatus refill station o Backup generator Additional specifications about Station 22 can be found in section 4.4 Site and Building Criteria. All questions and inquiries must be submitted via email to Elizabeth Sorg at elizabeth.sorg@rocklin.ca.us. The deadline to submit questions is August 30, 2023 The City also reserves the right to waive any informality in any proposal and to delete certain items listed in the proposal as set forth therein. The selection committee will make a recommendation to the approving authority. The total budget for this project is estimated to be between $17,000,000 and $20,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Fire / Police

$20,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
69
Bidding Soon
1,297
All Active Projects
532
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2023

January 22, 2024

img_map_placeholder

5100 Sierra College Blvd, Rocklin, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.