Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a transportation facility in Mobile, Alabama. Completed plans call for site work for a transportation facility.
Replace Wooden Crossties on the CGR Bridge. All marked ties will be replaced. All work will require fall protection. All Ties and spikes will be provided. Crossties will be 7"X 9"X 8'6" to 7"X 9"X 16'. Work will be scheduled around CGR vessel sailings. Railing and grating will need to be removed and reinstalled. Contractor will furnish all needed labor and equipment to complete this job. INDEMNIFICATION The Contractor shall assume all liability for and shall indemnify and save harmless the State of Alabama and the Alabama State Port Authority, doing business as Alabama State Docks (ASD), and its officers and employees from all damages and liability for injury to any person or persons, and injury to or destruction of property, including the loss of use thereof, by reason of an accident or occurrence arising from operations under the contract, whether such operations are performed by himself or by any subcontractor or by anyone directly or indirectly employed by either of them occurring on or about the premises, or the ways and means adjacent during the term of the contract, or any extension thereof, and shall also assume the liability for injury and/or damages to adjacent or neighboring property by reason of work done under the contract. INSURANCE REQUIREMENTS The Contractor shall not commence work under the contract until he has obtained all insurance required under the following paragraphs and until such insurance has been approved by ASD, nor shall the Contractor allow any subcontractor to commence work until all similar applicable insurance has been obtained by the subcontractor or the Contractor has provided coverage for the subcontractor. The Contractor shall provide, at his expense, insurance in accordance with the following: General Requirements (applicable to all policies) All policies of insurance must be written with companies acceptable to ASD. The Contractor shall furnish to ASD certificates of insurance, signed by the licensed agent evidencing required coverages. ASD reserves the right to require certified copies of any and all policies. Each policy of insurance shall provide, either in body of the policy or by endorsement, that such policy cannot be substantially altered or cancelled without thirty (21) days' written notice to ASD and to the insured. Except for Workers Compensation, said policies will identify Alabama State Port Authority, its officers, officials, agents, servants and employees as Primary and Non-contributory Additional Insureds in connection with work performed for, on behalf of, or on the property of ASD. This information sheet is provided as a guide to facilitate the bid process and highlight important points for consideration by bidders. Each bidder is responsible for fully reading and complying with the instructions on the Alabama State Port Authority bid form. This instruction sheet is to be used as a guide only. 1. No consideration will be given to bids unless presented on the Alabama State Port Authority "Requisition & Proposal" Form with suitable attachments as deemed necessary by the bidder. Alternate bid proposals may be rendered, with proper support. 2. The Alabama State Port Authority reserves the right to reject any and all bids if deemed in the Alabama State Port Authority interest. 3. No allowance will be made for error, either omission or commission. 4. Bids will not be accepted via fax. All bids must be sealed and sent via mail or hand delivered to the Terminal Railway office before the specified date and time. Bids must be marked with the following: "Bridge Tie Bid August 30th, 2023" 5. The Alabama State Port Authority accepts no responsibility for facilitating the receipt of bids. 7. Bids over $7,500 must be notarized. 8. Bids received after specified opening time will be returned to the bidder unopened. Bidders are required to show a return address on the bid envelope. 9. Bid proposals must be filled out completely, including the name, address, telephone number and signature of responsible person. 10. Questions may be directed to the Terminal Railway, kevin.hamilton@alports.com Commercial General Liability The Contractor shall take out and maintain during the life of the contract General Liability insurance, including Blanket Contractual and Completed Operations coverages, in an amount not less than $2,000,000 for any one occurrence for bodily injury, including death, and property damage liability. Automobile Liability The Contractor shall take out and maintain during the life of the contract Automobile Liability insurance covering any auto in an amount not less than $1,000,000 for any one occurrence for bodily injury, including death, and property damage liability. Workers Compensation The Contractor shall take out and maintain during the life of the contract Workers Compensation and Employers Liability insurance providing coverage under the Alabama Workers Compensation Act in an amount not less than that required by Alabama law. Where applicable, Contractor shall take out and maintain during the life of the contract insurance providing coverage as required by Federal statute, including but not limited to U.S. Longshoremen and Harborworkers' Compensation Act (USL&H), Jones Act, and Railroad Federal Employers Liability Act (FELA)
Bid Results
Transportation Terminals
$100,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2023
November 1, 2023
126 Industrial Canal Rd, Mobile, AL
Related To This Project
Mobile, AL
Bid Date: Sep 07 2023
Mobile, AL
Bid Date: Aug 31 2023
Mobile, AL
Bid Date: Aug 30 2023
Mobile, AL
Bid Date: Aug 25 2023
Mobile, AL
Bid Date: Aug 25 2023
Mobile, AL
Bid Date: Aug 16 2023
Mobile, AL
Bid Date: Aug 28 2023
Mobile, AL
Bid Date: Sep 01 2023
Mobile, AL
Bid Date: Sep 20 2023
Mobile, AL
Bid Date: Aug 23 2023
Mobile, AL
Bid Date: Aug 23 2023
Mobile, AL
Bid Date: Aug 23 2023
Mobile, AL
Bid Date: Aug 24 2023
Mobile, AL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.