BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a museum in Salt Lake City, Utah. Completed plans call for the demolition of a museum; for the construction of a 17,000-square-foot museum; and for site work for a museum.

AV Media Production services (Media Producer) are required for the Museum of Utah which is part of the New North Capitol Building. The new facility will house, but is not limited to, the new museum for the Department of Cultural & Community Engagement, general conference space, space for the Governor's Cabinet members, legislative space, and underground parking levels. The majority of AV elements required under this scope of work (SOW) are located within the approximately 17,000 square feet of museum space. Some key AV elements are located in the building's Lobby/Atrium space. The State has engaged The Design Minds, Inc. as Exhibit Designer through the completion of the project. Exhibit planning and design for the new Museum of Utah has been completed through Design Development. This includes 100% Media Design, created by RLMG. Please refer to the addenda to this SFC for a summary package of the exhibit design and for the 100% Media Design documents. The anticipated media elements discussed in this SFC are described in more detail in those appended documents. Question Submission Close Date 8/9/2023 3:00 PM MDT Demolition of an existing structure and construction of the New North Capitol Building began in 2022. The new facility on Capitol Hill will complete the Utah Capitol master plan adopted in 2009. Information about the North Capitol Building Construction Project, including additional information about the building's design, may be found electronically. The building construction is estimated to be complete in the winter of 2025-2026. Exhibit installation is anticipated to unfold beginning in the fall of 2025, with a project end date in March of 2026. Museum Exhibit Construction Budget: The overall production budget for the museum exhibits and Lobby interpretive elements is approximately $15,000,000. This amount includes audiovisual equipment budgeted at $1,748,785.00. This SFC requires the selected Media Producer to specify equipment that adheres to this budget. The budget for the AV Media Production services described in this SFC is $2,475,000.00. *Proposal dates for the required references, management plans, statements of qualifications, and interviews will be based on the Selection Schedule included in the SFC. The Division of Facilities Construction and Management reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the State.

Award

Museum

$165,000,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

21

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
67
Bidding Soon
1,013
All Active Projects
412
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 11, 2023

August 25, 2025

March 31, 2026

img_map_placeholder

50 State St, Salt Lake City, UT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.