BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in College Station, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project involves the construction of approximately 1,500 linear feet of improvements of Luther Street from Marion Pugh Boulevard to Penberthy Boulevard. These improvements will consist of removal and replacement of the existing roadway pavement, addition of sidewalk, installation of a storm drain system, replacement of the existing 16-inch DIP water main from Penberthy Boulevard to Sienna Drive. The proposed storm drain system will connect to the existing storm drain system approximately 700' to the south of Luther Street in Marion Pugh Boulevard. All proposals shall follow the format provided by the City of College Station. The City is seeking a construction company with quality experience in road and utility reconstruction. Performance Bond and Payment Bond, of the General Conditions To The Construction Agreement Between The City Of College Station And Contractor set forth Owner's requirements as to Performance and Payment Bonds. - Proposal Bid Bond in an amount no less than five percent (5%) of price proposal Project Estimate: 2,000,000.00 wage rates paid by the Contractor and any subcontractor on this Project shall be not less than the general prevailing rate of per diem wages for work of a similar character in this locality as specified in the schedule of general prevailing rates. Owner reserves the right to reject any and all Proposals, to waive any and all informalities and irregularities and to negotiate contract terms with the Successful Offeror, and the right to disregard all non-conforming, non-responsive, unbalanced or conditional Proposals.or irregularity. Question Cutt off Date & Time 8/25/2023 03:00:00 PM (ET) Questions and inquiries about this RFP should be submitted in writing via the Q&A feature available through the Brazos Valley e-Marketplace ("Bidding System"). The deadline for submitting written requests for clarification is Friday, August 25, 2023, at 2:00 p.m. CT

Award

Roads / Highways

$1,719,810.00

Public - City

Paving, Site Work

78

13

10

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
62
Bidding Soon
2,855
All Active Projects
1,073
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

October 31, 2023

img_map_placeholder

Luther St, College Station, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.