BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a museum in Yorkton, Saskatchewan. Completed plans call for the renovation of a museum.

Removal of and installation of an 85,000 BTU Natural Gas 2-stage variable High Efficiency furnace with a Down Flo Conversion kit and a 2-ton 16 Seer Air conditioner. This scope of work is not intended to be all encompassing and complete. The Proposal should expand on the scope of work with a listing of work activities that the Proponent would undertake for a complete project. After the contract award, WDM, in consultation with the successful Proponent, may refine the project requirements if needed. The Proponent is responsible for acquiring all permits necessary to complete the required work. This project involves the removal of the existing furnace and condenser, installation of new furnace and air conditioner unit and all commissioning to get the unit functional. A site visit to determine the viability of the existing duct work and make any notes to changes that may happen. Pricing and Scope of work is to include but not limited to the following: Removal and disposal of existing furnace and condenser including safely disconnecting and decommission of the refrigerant system Supply and install new HVAC unit. Perform all checks to ensure the unit is functioning properly in both heating and cooling modes. All site cleanup after removal and installation work is complete. Proponent should be directed in writing, (no oral requests), to the following person. Jody Gillis Facilities and Safety Manager Western Development Museum - Corporate Office 2935 Lorne Avenue Saskatoon, SK S7J 0S5 Jgillis@wdm.ca Requests shall be received NO LATER THAN THREE (3) DAYS PRIOR TO THE CLOSING DATE identified in this Proposal request. Contract Awarded: August 31, 2023 Project Start Date: September 2023 Project End Date: September 2023

Post-Bid

Museum

$50,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
21
All Active Projects
4
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

September 1, 2023

img_map_placeholder

Highway 16A, Yorkton, SK

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.