BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2023 at 8:00 PM

Updated November 15, 2023

Site work for a sidewalk / parking lot in Folsom, California. Completed plans call for site work for a sidewalk / parking lot.

The project includes construction of flatwork and landscape improvements related to the installation of the guitar pick sculpture, generally including but not limited to: Clearing and grubbing Selective demolition and patching back of existing path Installation of concrete footing and sleeve for sculpture New concrete flatwork with decorative sandblasted patterns and cast iron inlay Coordinate installation of sculpture (by others) Installation of seating, bike racks, and special features Protection of existing trees in work area Total area of disturbance is approximately 3,500 SF For pre-bid questions, contact: Brett Bollinger at 916-461-6632 or bbollinger@folsom.ca.us

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
376
Active Projects
186
Bidding Soon
2,600
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.