Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a road / highway in Point Washington, Florida. Completed plans call for site work for a road / highway.
Counties: Walton Road Name: Ponce De Leon Maint - Fence-gate- and Tree Removal at Ponds Limits: Midpoint Project(S): 42214337231(*) Federal Aid No: N/a Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 15 Days Contract Days: 60 The Improvements under this Site-Specific Contract consist of the repair of existing Type B vinyl coated fence, removal/replacement of slide gates with double swing gates and the resetting of existing swing gates as needed at retention ponds located in Walton County along SR 30 (US 98) and SR 83 (US 331). Work also includes tree and brush removal, clearing and grubbing at dry bottom ponds and the repair of eroded areas within the fenced limits as indicated in the Appendices. Maintenance of Traffic and Mobilization will be incidental to the pay items listed. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Departments budget. Maintenance contracts do not require a contractor to have a certificate of qualification, unless stipulated in the project description and specifications. If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. FLDOT - Call Order: 005 - Ponce De Leon Maint - Fence-Gate- and Tree Removal at Ponds Question Deadline 09/07/2023 at 5:00 PM CT If You Have Any Technical Questions, You Must Go Through Our Bid Question & Answer Site. Question Posted to This Site on the Seventh Calender Days Prior to the Bid Opening Will Be Responded to by the Department. Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on Electronically.
Award
Roads / Highways
$146,075.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2023
October 16, 2023
FL-30, Point Washington, FL
Related To This Project
Point Washington, FL
--
Point Washington, FL
Bid Date: May 09 2024
Point Washington, FL
Bid Date: Jun 08 2023
Point Washington, FL
--
Point Washington, FL
--
Point Washington, FL
Bid Date: Jan 25 2023
Point Washington, FL
Bid Date: Jun 09 2022
Point Washington, FL
--
Point Washington, FL
Bid Date: Sep 08 2022
Freeport, FL
Bid Date: Sep 14 2023
Cantonment, FL
Bid Date: Sep 14 2023
Marianna, FL
Bid Date: Sep 14 2023
Cantonment, FL
Bid Date: Sep 14 2023
Arcadia, FL
Bid Date: Sep 14 2023
Jacksonville, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.