BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Beaumont, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Furnishing All Plans, Administration, Superintendence, Labor, Services, Materials, Tools, Equipment, Supplies, Transportation, Utilities, and All Other Items and Facilities Necessary Therefore, as Provided in the Contract Documents For the Construction of: City of Beaumont Street Rehabilitation Citywide - Phase V The Contractor will perform the following street rehabilitation on: various roadways throughout the City of Beaumont. Item 100-Preparing Right of Way: Prepare the right of way and designated easements for construction operations by removing and disposing of all obstructions when removal of such obstructions is not specifically shown on the plans to be paid by other Items. Item 104-Removing Concrete: Break, remove, and salvage or dispose of existing hydraulic cement concrete. Remove existing hydraulic cement concrete from locationsshown on the plans.Avoid damaging concrete that will remain in place. Saw-cut and remove the existing concrete to neat lines. Replace any concrete damaged by the Contractor at no expense to the Department. Accept ownership and properly dispose of broken concrete in accordance with federal, state, and local regulations unless otherwise shown on the plans. Item 105-Removing Treated and Untreated Base and Asphalt Pavement: Remove existing asphalt pavement before disturbing stabilized base. Avoid contamination of the asphalt materials and damage to adjacent areas. Repair material damaged by operations outside the designated locations. Stockpile materials designated salvageable at designated sites when shown on the plans or as directed. Prepare stockpile site by removing vegetation and trash and by providing for proper drainage. Material not designated to be salvaged will become the property of the Contractor. When this material is disposed of, do so in accordance with federal, state, and local regulations. Item 134-Backfilling Pavement Edges: Backfill pavement edges in conformance with the typical sections shown on the plans. Haul the backfill material to the required location before placing the finish surface course unless directed otherwise. Spread, compact, and shape the backfill material in accordance with the typical sections after placing the finish surface course. Do not drag, push, or scrape material across completed pavement. Item 162-Sodding for Erosion Control: Cultivate the area to a depth of 4 in. before placing the sod. Plant the sod specified and mulch, if required, after the area has been completed to lines and grades as shown on the plans. Apply fertilizer uniformly over the entire area in accordance with Article 166.3., Construction, and water in accordance with Article 168.3.,Construction. Plant between the average date of the last freeze in the Spring and 6 weeks before the average date for the first freeze in the Fall according to the Texas Almanac for the project area. Question Deadline 09/18/2023 at 12:00 PM CT

Award

Roads / Highways

$7,874,336.00

Public - City

Paving, Site Work

367

17

8

11

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
47
Bidding Soon
1,330
All Active Projects
611
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.